How To Fix KO418 - No integrated planning for order &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: KO - Master data for CO orders

  • Message number: 418

  • Message text: No integrated planning for order &

  • Show details Hide details
  • What causes this issue?

    Order &V1& is not integrated for planning purposes.

    System Response

    "&v2& not allowed for this order.

    How to fix this error?

    Business transaction &V2& is only allowed in plan-integrated orders.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KO418 - No integrated planning for order & ?

    The SAP error message KO418 ("No integrated planning for order &") typically occurs in the context of production planning and controlling (PP) when there is an attempt to perform an operation that requires integrated planning for an order, but the necessary configuration or data is missing.

    Cause:

    1. Missing Configuration: The order type may not be configured for integrated planning in the system.
    2. Order Type Settings: The specific order type being used may not be set up to allow for integrated planning.
    3. Master Data Issues: There may be issues with the master data related to the order, such as missing or incorrect settings in the material master or work center.
    4. Planning Version: The planning version being used may not be compatible with the order type or may not be set up correctly.
    5. System Settings: The system may not be set up to allow integrated planning for the specific scenario being executed.

    Solution:

    1. Check Order Type Configuration:

      • Go to the configuration settings for the order type in transaction code SPRO.
      • Navigate to Production Planning > Integrated Planning > Order Types and ensure that the order type is configured for integrated planning.
    2. Review Master Data:

      • Check the material master and work center settings to ensure they are correctly configured for integrated planning.
      • Ensure that the relevant planning parameters are set correctly.
    3. Verify Planning Version:

      • Check the planning version being used for the order. Ensure that it is set up correctly and is compatible with the order type.
    4. Consult Documentation:

      • Review SAP documentation or help resources for any specific notes related to the error message KO418.
    5. Check User Authorizations:

      • Ensure that the user has the necessary authorizations to perform integrated planning activities.
    6. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO01 (Create Production Order), CO02 (Change Production Order), and CO03 (Display Production Order) to troubleshoot the issue.
    • SAP Notes: Search for SAP Notes related to error KO418 in the SAP Support Portal for any patches or updates that may address the issue.
    • Integration with Other Modules: Understand how integrated planning interacts with other modules like Materials Management (MM) and Sales and Distribution (SD) to ensure that all relevant data is correctly aligned.

    By following these steps, you should be able to identify the cause of the KO418 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant