Message type: E = Error
Message class: KK -
Message number: 749
Message text: Mixed cost estimate exists: maximum of &1 explosion level(s) possible
The material cost estimate is to be exploded for one or more mixed cost
estimates. However, material explosion does not support the explosion
of mixed cost estimates.
The explosion of the material cost estimate is terminated.
The material cost estimate can only be exploded up to explosion level
&v1&. Restrict the explosion to no more than &v1& level(s).
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KK749
- Mixed cost estimate exists: maximum of &1 explosion level(s) possible ?The SAP error message KK749, which states "Mixed cost estimate exists: maximum of &1 explosion level(s) possible," typically occurs in the context of cost estimating in SAP, particularly when dealing with mixed cost estimates in the Controlling (CO) module. This error indicates that the system has encountered a mixed cost estimate that exceeds the allowed number of explosion levels.
Cause:
- Mixed Cost Estimate: The error arises when a mixed cost estimate (which includes both variable and fixed costs) is being processed, and the number of levels of detail (explosion levels) in the cost estimate exceeds the maximum limit set in the system.
- Configuration Settings: The maximum number of explosion levels is defined in the system configuration. If the cost estimate requires more levels than allowed, this error will be triggered.
- Complexity of the Cost Structure: If the cost structure of the product or service being estimated is too complex, it may lead to a situation where the number of explosion levels exceeds the configured limit.
Solution:
- Check Configuration: Review the configuration settings for cost estimates in the SAP system. You may need to adjust the maximum number of explosion levels allowed. This can typically be done in the configuration settings under the Controlling module.
- Transaction Code: SPRO (SAP Project Reference Object)
- Navigate to: Controlling -> Product Cost Controlling -> Cost Object Controlling -> Define Maximum Explosion Levels
- Simplify Cost Structure: If possible, simplify the cost structure of the product or service. This may involve reducing the number of components or levels in the cost estimate.
- Review Cost Estimate: Analyze the specific cost estimate that is causing the error. Check if there are unnecessary components or if the structure can be optimized.
- Consult Documentation: Refer to SAP documentation or help resources for more detailed guidance on handling mixed cost estimates and explosion levels.
Related Information:
If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP Controlling for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KK748
Mixed cost estimate in explosion level &1 for material &2 plant &3
What causes this issue? The material cost estimate is to be exploded in explosion level &v1& for a mixed cost estimate (material &v2&...
KK747
There is no plant &2 in controlling area &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KK750
***** Messages for Where-Used List of Base Planning Objects ******
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KK751
No usage found for base planning object & &
What causes this issue? You are creating a where-used list for base planning object &v2& in controlling area &v1&. This base planning...
Click on this link to search all SAP messages.