Message type: E = Error
Message class: KK -
Message number: 059
Message text: Data relevant to costing was changed. Adjust cost estimate
You have made changes to master data that are relevant to costing (such
as the costing sheet, overhead key, plant, or profit center). This can
result in inconsistencies between the master data and the cost estimate
concerned.
The system does not allow you to save the master data.
Go to the cost estimate by choosing the <LS>Change cost estimate</>
function, and save it again. This updates the master data, which you
can then saved.
Error message extract from SAP system. Copyright SAP SE.
KK059
- Data relevant to costing was changed. Adjust cost estimate ?The SAP error message KK059 ("Data relevant to costing was changed. Adjust cost estimate") typically occurs in the context of cost accounting and cost estimates in SAP. This message indicates that some data that is relevant to the cost estimate has been modified after the cost estimate was created, and therefore, the cost estimate needs to be adjusted to reflect these changes.
Cause: Changes in Master Data: Changes in master data such as material master, bill of materials (BOM), routing, or work center can lead to this error. For example, if the cost of a material or the time required for a process has been updated, the existing cost estimate may no longer be valid. Changes in Costing Variants: If the costing variant settings have been altered, it may affect how costs are calculated, leading to the need for an adjustment. Changes in Production Versions: If the production version of a material has been
Get instant SAP help. Sign up for our Free Essentials Plan.
KK058
More than one cost estimate has the key &
What causes this issue? The system found more than one cost estimate that has the key &v1&. This means that you cannot copy the cost estimate...
KK057
Cost estimate could not be selected
What causes this issue? One of the cost estimates to be selected does not exist.System Response Processing was canceled.How to fix this error? Chec...
KK060
No overhead key exists for costing sheet &
What causes this issue? Costing sheet &v1& does not allow an overhead key.System Response The system issues an error message and will not al...
KK061
No authorization to create base planning obj. in controlling area &
What causes this issue? You do not have authorization to create base planning objects in controlling area &V1&. INCLUDE NA_AUTH_K_CKBS_DUMMY ...