Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 481
Message text: No parallel valuation with results analysis type B
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KJ481
- No parallel valuation with results analysis type B ?The SAP error message KJ481 "No parallel valuation with results analysis type B" typically occurs in the context of controlling and results analysis in SAP. This error indicates that there is an issue with the configuration or setup of the results analysis for a particular project or order.
Cause:
Results Analysis Type Configuration: The results analysis type B (which is used for certain types of projects or orders) may not be configured correctly for parallel valuation. This can happen if the settings for the project or order do not allow for parallel valuation.
Missing Configuration: The necessary configuration for parallel valuation in the controlling area or the project definition may be missing or incorrect.
Inconsistent Data: There may be inconsistencies in the data related to the project or order that prevent the system from performing the results analysis.
Project/Order Status: The status of the project or order may not allow for results analysis to be performed.
Solution:
Check Configuration: Review the configuration settings for results analysis types in the controlling area. Ensure that the settings for results analysis type B allow for parallel valuation.
Project Definition: Verify the project definition or order settings to ensure that they are correctly set up for parallel valuation. This includes checking the valuation methods and results analysis settings.
Data Consistency: Check for any inconsistencies in the data related to the project or order. This may involve reviewing the postings and ensuring that all necessary data is complete and accurate.
Status Check: Ensure that the project or order is in a status that allows for results analysis. If the project is closed or in a status that does not permit results analysis, you may need to change the status.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring results analysis types and parallel valuation.
SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance on configuration.
Related Information:
CJ20N
(Project Builder) or KKAO
(Results Analysis) to review and adjust the settings.By following these steps, you should be able to identify and resolve the cause of the KJ481 error message in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ480
Customer enhancement 2: sum of changes to actual data is not zero
What causes this issue? Changes were made to the actuals in customer enhancement 2. These changes must add up to zero. However, the changes do not ad...
KJ479
Enter an allowed "Valid from" period in the assignment
What causes this issue? You didn't enter an allowable <LS>Valid from</> date in the assignment of the cost elements to the <DS:GL...
KJ482
Make an entry in the "Line ID costs" field in the valuation method
What causes this issue? You have not made an entry in the <LS>Line ID costs</> field in the Expert Mode, although you are using <DS:GL...
KJ483
With results analysis type & set Quantities to &
What causes this issue? The <LS>Quantities</> indicator defined for the results analysis type conflicts with the results analysis type.Sy...
Click on this link to search all SAP messages.