How To Fix KJ419 - Only use if profit indicator is set to percentage of completion


KJ419 - Overview

  • Message type: E = Error

  • Message class: KJ - Cost Object Controlling for Make-to-Order Production

  • Message number: 419

  • Message text: Only use if profit indicator is set to percentage of completion

  • Show details Hide details
  • What causes this issue?

    The <DS:GLOS.results_analysis_data>results analysis data</> you entered
    is only relevant for the <GL:POC_method>POC method</>, such as:
    Revenue surplus
    Realized loss
    Loss
    The <DS:GLOS.results_analysis_key>results analysis key</> of the object
    specifies that <DS:GLOS.results_analysis>results analysis</> is to be
    performed using a different method in which no POC results analysis
    method will be used.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Check your entry.
    If necessary, select a different <DS:DE.ABGR_ABGTY>results analysis
    form</>.
    If you want to create results analysis using the POC method, notify
    your system administrator.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KJ419 - Only use if profit indicator is set to percentage of completion ?
    The SAP error message KJ419, "Only use if profit indicator is set to percentage of completion," typically occurs in the context of project management and controlling within SAP, particularly when dealing with project-related profitability analysis.
    
    Cause: This error message is triggered when you attempt to perform an action or transaction that is not compatible with the profit indicator settings for a project. Specifically, it indicates that the system expects the profit indicator to be set to "percentage of completion" (POC), but it is not. This can happen in scenarios such as: Trying to post costs or revenues to a project that is not configured to use the percentage of completion method. The project or WBS (Work Breakdown Structure) element is set up with a different profit indicator that does not align with the expected settings for POC.
    Solution: To resolve this error, you can take the following steps: Check Project Settings: Navigate to the project in question and

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker