Message text: Profit basis qty & cannot be used for planned results analysis
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KJ385
- Profit basis qty & cannot be used for planned results analysis ?The SAP error message KJ385, which states "Profit basis qty & cannot be used for planned results analysis," typically occurs in the context of controlling and profitability analysis within SAP. This error indicates that there is an issue with the profit basis quantity that is being used for planned results analysis in the system.
Cause:
- Incorrect Configuration: The profit basis quantity may not be correctly configured in the system. This could be due to missing or incorrect settings in the controlling area or profit center.
- Data Inconsistency: There may be inconsistencies in the data related to the profit basis quantity, such as missing entries or incorrect mappings.
- Planning Data Issues: The planning data for the relevant period may not be correctly set up or may be missing.
- Versioning Issues: The version of the planning data being used may not be compatible with the results analysis process.
Solution:
- Check Configuration: Review the configuration settings for the controlling area and profit center to ensure that the profit basis quantity is correctly defined.
- Data Validation: Validate the data entries related to the profit basis quantity. Ensure that all necessary data is present and correctly mapped.
- Review Planning Data: Check the planning data for the relevant period. Ensure that all necessary planning entries are present and correctly set up.
- Version Check: Ensure that the version of the planning data being used is compatible with the results analysis process. If necessary, switch to a different version that is valid for the analysis.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error message and related configuration settings.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP Controlling (CO) and Profitability Analysis (CO-PA) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KJ384
Qty-based RA with internal order or project: use profit basis C
What causes this issue? You selected results analysis type <ZH>M</> (quantity-based) for <DS:GLOS.results_analysis>results analysis...
KJ383
Create statistical key figure '&' with type 2
What causes this issue? You have entered a statistical key figure whose values are interpreted as fixed values (key figure type 1) and not as totals ...
KJ386
Results reserve indicator set to '&'
What causes this issue? The results reserve is specified in the valuation method. In the present case, the indicator was set to &V1&.System R...
KJ387
With (reference) version 000 use actual and/or plan results analysis
What causes this issue? In results analysis version 000 in Extended Control, you entered <LS>Simulate actual with plan</> This can only b...