Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 271
Message text: Product cost collector & (material & plant & ProdVersion &) processed
<DS:GLOS.work_in_process>Work in process</> was successfully calculated
for <DS:GLOS.product_cost_collector>product cost collector</> &V1& or
production version &V4& of material &V2& in plant &V3&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KJ271
- Product cost collector & (material & plant & ProdVersion &) processed ?The SAP error message KJ271 indicates that a product cost collector has been processed for a specific combination of material, plant, and production version. This typically occurs in the context of product costing and can arise during various processes, such as when trying to reprocess or change data related to a product cost collector that has already been finalized.
Cause:
- Product Cost Collector Already Processed: The primary cause of this error is that the product cost collector for the specified material, plant, and production version has already been processed. This means that the costing run has been completed, and the data is locked for further changes.
- Costing Lock: The system may have a lock on the costing data to prevent changes that could lead to inconsistencies in financial reporting.
- Incorrect Data Entry: Attempting to process a cost collector that does not exist or has been incorrectly specified can also lead to this error.
Solution:
- Check Status: Verify the status of the product cost collector. You can do this by navigating to the relevant transaction (e.g., CK11N for cost estimate) and checking if the cost collector is indeed processed.
- Reprocess if Necessary: If you need to make changes, you may need to reverse the previous costing run. This can be done using transaction CKR1 (for reversing a cost estimate) or similar transactions, depending on your specific requirements.
- Consult Documentation: Review the documentation for the product cost collector to understand the implications of reversing or reprocessing.
- Use Transaction CK40N: If you need to create a new cost estimate, you can use transaction CK40N to create a new cost estimate for the product cost collector.
- Check for Locks: Ensure that there are no locks on the costing data that could prevent processing. You can check for locks using transaction SM12.
- Consult with Finance Team: If you are unsure about the implications of reversing or changing a processed cost collector, consult with your finance or controlling team to ensure compliance with accounting practices.
Related Information:
By following these steps, you should be able to address the KJ271 error and understand the implications of processing product cost collectors in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ270
Product cost collector & processed (WIP was calculated)
What causes this issue? <DS:GLOS.work_in_process>Work in process</> was successfully calculated for <DS:GLOS.product_cost_collector>...
KJ269
Order & processed (work in process was calculated)
What causes this issue? <DS:GLOS.work_in_process>Work in process</> was successfully calculated for order &V1&.System Response T...
KJ273
Cannot calculate WIP for manual product cost collector &
What causes this issue? The <DS:GLOS.product_cost_collector>product cost collector</> with order number &V1& was created manually...
KJ274
Control parameters missing for plant &
What causes this issue? Plant &V1& does not have any control parameters.System Response The system issues an error message and will not allo...
Click on this link to search all SAP messages.