Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 149
Message text: & & is not assigned to any WBS element. Actual will not replace plan
The order is not asssigned to a WBS element.
For orders assigned to WBS elements, appended plan values are replaced
by actual values if the WBS element and assigned orders have the status
TABG.
Plan values are not replaced by actual values for this order.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KJ149
- & & is not assigned to any WBS element. Actual will not replace plan ?The SAP error message KJ149 indicates that a cost element (or a cost object) is not assigned to any Work Breakdown Structure (WBS) element, which prevents actual costs from replacing planned costs in the system. This typically occurs in the context of project management and controlling within SAP.
Cause:
- Missing Assignment: The cost element or cost object (like an internal order or project) is not linked to any WBS element in the system.
- Incorrect Configuration: The configuration settings for the project or cost element may not be set up correctly.
- Data Entry Errors: There may be errors in data entry, such as incorrect project codes or cost element codes.
- Project Status: The project or WBS element may be in a status that does not allow for actual costs to be posted.
Solution:
Check Assignments:
- Go to the WBS element in question and verify if the cost element is properly assigned.
- Use transaction codes like
CJ20N
(Project Builder) to check the structure and assignments.Assign Cost Elements:
- If the cost element is not assigned, you can assign it to the appropriate WBS element using the project management tools in SAP.
Review Configuration:
- Ensure that the configuration settings for the project and cost elements are correct. This may involve checking the settings in the controlling (CO) module.
Correct Data Entry:
- Review the entries made for the project and cost elements to ensure they are correct and complete.
Check Project Status:
- Ensure that the project or WBS element is in a status that allows for actual postings. If it is closed or in a status that restricts postings, you may need to change the status.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on handling this error message.
Related Information:
CJ20N
, CJI3
(Project Actual/Plan/Variance), and CJI5
(Actual Line Items).By following these steps, you should be able to resolve the KJ149 error and ensure that actual costs can replace planned costs in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
KJ148
The order is not a WIP element
What causes this issue? WIP elements can be the following: The system issues an error message and will not allow you to continue with this transactio...
KJ147
Item & also has a results analysis key (sales order structure = K)
What causes this issue? You have given the field "sales order structure" the value "K". This means that only one item of a sales ...
KJ150
Error in job scheduling: Function K_BATCH_REQUEST, return code &
What causes this issue? A system error has occurred.System Response The system issues an error message and will not allow you to continue with this ...
KJ151
Please schedule background processing with "Execute" function
What causes this issue? You are using the 'schedule background processing' option on the request screen and have started the program with &...
Click on this link to search all SAP messages.