Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 138
Message text: WBS element & is flagged for deletion - no results analysis possible
The object is flagged for deletion.
<DS:GLOS.Results_analysis>Results analysis</> cannot be carried out.
If necessary, cancel the deletion flag.
Error message extract from SAP system. Copyright SAP SE.
KJ138
- WBS element & is flagged for deletion - no results analysis possible ?The SAP error message KJ138 indicates that a Work Breakdown Structure (WBS) element is flagged for deletion, which means that it cannot be used for results analysis. This typically occurs in project management within SAP, particularly in the context of controlling and financial reporting.
Cause: Flagged for Deletion: The WBS element has been marked for deletion in the system. This can happen if the project is being closed or if the WBS element is no longer needed. Inconsistent Data: There may be inconsistencies in the data related to the WBS element, such as incomplete postings or missing configurations. Project Closure: If the project associated with the WBS element is closed, the WBS may be flagged for deletion as part of the project closure process.
Solution: Check Deletion Flag: Go to the WBS element in the SAP system and check if it is indeed flagged for deletion. You can do this by navigating to the WBS element
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ137
No item -> valuation type undefined
What causes this issue? No item exists for the run schedule header.System Response <DS:GLOS.WIP_calculation>WIP calculation</> is not po...
KJ136
This item has a separate cost collector
What causes this issue? The run schedule header item can carry costs. <DS:GLOS.WIP_calculation>WIP calculation</> for run schedule header...
KJ139
Project & is flagged for deletion
What causes this issue? The project is flagged for deletion.System Response You can no longer process the project.How to fix this error? If necessa...
KJ140
Collective order & is activity-assigned
What causes this issue? The network order is activity-assigned. <DS:GLOS.WIP_calculation>WIP calculation</> cannot be carried out for suc...
Click on this link to search all SAP messages.