Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 120
Message text: No WIP at actual cost allowed in Product Cost by Period
In Product Cost by Period,
<DS:GLOS.3526B774AFAB52B9E10000009B38F974>work in process</> can only
be calculated at target cost. This is because the
<DS:GLOS.3526B637AFAB52B9E10000009B38F974>variance calculation</>
process only calculates variances by period, so WIP at actual costs
would not be included. This would result in actual costs being settled
more than once.
You are using Product Cost by Period if there is a periodic
distribution rule in the
<DS:GLOS.3526B633AFAB52B9E10000009B38F974>settlement rule</> that
settles to material with a percentage of greater than 0.
Use <DS:GLOS.3526B609AFAB52B9E10000009B38F974>full settlement</> or
calculate the work in process at target costs.
Error message extract from SAP system. Copyright SAP SE.
KJ120
- No WIP at actual cost allowed in Product Cost by Period ?The SAP error message KJ120 "No WIP at actual cost allowed in Product Cost by Period" typically occurs in the context of product costing and work in progress (WIP) accounting. This error indicates that the system is not allowing the calculation of WIP at actual costs for a particular period, which can be due to several reasons. Causes: Costing Variant Settings: The costing variant used may not be configured to allow WIP at actual costs. This can happen if the settings for the costing variant do not permit WIP calculations or if the relevant parameters are not set correctly. Period Closing: If the period has been closed in the system, it may prevent any further WIP calculations or adjustments from being made. Costing Type: The costing type used may not support WIP at actual costs. For example, if the costing type is set to only allow standard costing, it will not permit actual cost
Get instant SAP help. Sign up for our Free Essentials Plan.
KJ119
Order & is assigned to a cost object hierarchy with cost object &
What causes this issue? You are attempting to perform <DS:GLOS.WIP_calculation>WIP calculation </> for order &V1& using the actua...
KJ118
Line ID &: Planned quantity but no planned value
What causes this issue? To be able to calculate the quantity for a value from results analysis, the system requires the planned quantity and the plan...
KJ121
WBS element & is neither an external nor an internal billing element
What causes this issue? Results analysis can only be carried out for WBS elements that are flagged as <DS:GLOS.billing_element>billing elements...
KJ122
The fixed price version (&) must differ from the actual version (&)
What causes this issue? When a project is being realized in the Project System, you can enter a fixed price allocation that passes the costs for prov...
Click on this link to search all SAP messages.