Message type: E = Error
Message class: KJ - Cost Object Controlling for Make-to-Order Production
Message number: 119
Message text: Order & is assigned to a cost object hierarchy with cost object &
You are attempting to perform <DS:GLOS.WIP_calculation>WIP calculation
</> for order &V1& using the actual cost method. This order is assigned
to cost object &V2& in a <DS:GLOS.cost_object_hierarchy>cost object
hierarchy</>. Work in process for such orders can only be calculated at
target costs.
INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TX LANGUAGE EN
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
KJ119
- Order & is assigned to a cost object hierarchy with cost object & ?The SAP error message KJ119 indicates that a particular order is assigned to a cost object hierarchy, but there is an issue with the assignment or configuration. This error typically arises in the context of controlling (CO) and can be related to various factors, such as configuration settings, master data issues, or incorrect assignment of cost objects.
Cause:
- Incorrect Assignment: The order may be incorrectly assigned to a cost object hierarchy that does not support it.
- Hierarchy Configuration: The cost object hierarchy may not be properly configured to include the order type or the specific order in question.
- Master Data Issues: There may be issues with the master data related to the cost objects or the hierarchy itself.
- Authorization Issues: The user may not have the necessary authorizations to access or modify the cost object hierarchy.
Solution:
- Check Assignment: Verify that the order is correctly assigned to the appropriate cost object hierarchy. You can do this by navigating to the order details and checking the assignment settings.
- Review Hierarchy Configuration: Ensure that the cost object hierarchy is correctly configured to include the order type. This may involve checking the settings in the controlling area and ensuring that the hierarchy is active and properly structured.
- Master Data Review: Check the master data for the cost objects involved. Ensure that all relevant data is complete and accurate.
- Authorization Check: Ensure that the user has the necessary authorizations to work with the cost object hierarchy and the associated orders.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error message and related configuration settings.
Related Information:
KOB1
(Order Actual Line Items), KOH1
(Cost Object Hierarchy), or KSV5
(Display Cost Object Hierarchy) to investigate the issue further.By following these steps, you should be able to identify the root cause of the KJ119 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KJ118
Line ID &: Planned quantity but no planned value
What causes this issue? To be able to calculate the quantity for a value from results analysis, the system requires the planned quantity and the plan...
KJ117
Results analysis version & canceled. End indicator set to "D"
What causes this issue? <GL:results_analysis_data>Results analysis data</> was calculated for an order that is assigned to a sales order ...
KJ120
No WIP at actual cost allowed in Product Cost by Period
What causes this issue? In Product Cost by Period, <DS:GLOS.3526B774AFAB52B9E10000009B38F974>work in process</> can only be calculated at...
KJ121
WBS element & is neither an external nor an internal billing element
What causes this issue? Results analysis can only be carried out for WBS elements that are flagged as <DS:GLOS.billing_element>billing elements...
Click on this link to search all SAP messages.