How To Fix KI395 - Activity allocation with budget period is not allowed


KI395 - Overview

  • Message type: E = Error

  • Message class: KI -

  • Message number: 395

  • Message text: Activity allocation with budget period is not allowed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KI395 - Activity allocation with budget period is not allowed ?
    The SAP error message KI395, which states "Activity allocation with budget period is not allowed," typically occurs in the context of controlling and budgeting within SAP. This error indicates that there is an issue with the allocation of costs to activities when a budget period is involved.
    
    Cause: Budgeting Configuration: The error often arises when the system is configured to prevent activity allocations during certain budget periods. This can happen if the budget is locked or if the settings do not allow for allocations in the specified period. Activity Type Settings: The activity type may be configured in such a way that it does not allow allocations when a budget period is active. Cost Center or Internal Order Settings: The cost center or internal order may have restrictions that prevent activity allocations during the budget period. Period Lock: The period in which you are trying to perform the allocation may be locked for posting, which

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author