Do you have any question about this error?
Message type: E = Error
Message class: KI -
Message number: 395
Message text: Activity allocation with budget period is not allowed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KI395
- Activity allocation with budget period is not allowed ?The SAP error message KI395, which states "Activity allocation with budget period is not allowed," typically occurs in the context of controlling and budgeting within SAP. This error indicates that there is an issue with the allocation of costs to activities when a budget period is involved.
Cause:
- Budgeting Configuration: The error often arises when the system is configured to prevent activity allocations during certain budget periods. This can happen if the budget is locked or if the settings do not allow for allocations in the specified period.
- Activity Type Settings: The activity type may be configured in such a way that it does not allow allocations when a budget period is active.
- Cost Center or Internal Order Settings: The cost center or internal order may have restrictions that prevent activity allocations during the budget period.
- Period Lock: The period in which you are trying to perform the allocation may be locked for posting, which can lead to this error.
Solution:
- Check Budget Settings: Review the budget settings in the controlling area to ensure that activity allocations are permitted during the specified budget period.
- Adjust Activity Type Configuration: If applicable, modify the configuration of the activity type to allow allocations during budget periods.
- Unlock Period: If the period is locked, you may need to unlock it for posting. This can be done by the financial controller or someone with the appropriate authorization.
- Review Cost Center/Order Settings: Check the settings for the cost center or internal order to ensure that they allow for activity allocations during the budget period.
- Consult Documentation: Refer to SAP documentation or consult with your SAP support team for specific configuration settings that may need to be adjusted.
Related Information:
If the issue persists after checking these areas, it may be beneficial to engage with your SAP support team or a consultant who specializes in SAP Controlling (CO) for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KI352
Postings to a parallel CO version are not allowed with account assgmt &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KI351
Account assignment check in parallel GL ledgers like leading ledger
What causes this issue? A posting for a parallel general ledger is created.System Response If the message type is "E" (error), the account...
KI396
Derived budget period is ignored for the activity allocation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KI398
The recovery indicator is being re-derived
<ZK>&CAUSE&</> The account assignment was changed.System Response The system re-derives the recovery indicator, even though this...
Click on this link to search all SAP messages.