Message type: E = Error
Message class: KI -
Message number: 153
Message text: Account assignment to activity types not active in CO area &2 in &1
You have entered an <DS:DE.LSTAR>activity type</> as the account
assignment object,
Assignment to activity types is not active in fiscal year &V1& in
controlling area &V2&.
Instead of entering the activity type of a cost center as the account
assignment object, enter only the cost center or set the indicator
<DS:DE.ACTPA>"Account assignment: activity types"</> in the
fiscal-year-dependent settings for controlling area &V2&.
Error message extract from SAP system. Copyright SAP SE.
KI153
- Account assignment to activity types not active in CO area &2 in &1 ?The SAP error message KI153 indicates that there is an issue with the account assignment to activity types in a specific controlling (CO) area. This error typically arises when you attempt to post costs to an activity type that is not active in the specified controlling area.
Cause: Inactive Activity Type: The activity type you are trying to use is not activated in the specified controlling area.
Configuration Issues: There may be configuration issues in the controlling area settings or the activity type settings. Missing Master Data: The necessary master data for the activity type may not be set up correctly or is missing.
Solution: To resolve the KI153 error, you can follow these steps: Check Activity Type Status: Go to the SAP transaction code KP26 (Change Activity Type Planning) or KP06 (Change Cost Center Planning) to check if the activity type is active in the specified controlling area. If it is inactive, you will need to activate it. Activate
Get instant SAP help. Sign up for our Free Essentials Plan.
KI152
Enter a sender activity type also
What causes this issue? You have specified sender cost center &V1& without an activity type.System Response A sender cost center is only val...
KI151
Cost center/activity type &1/&2 uses allocation cost element &3, not &4.
What causes this issue? You have entered the combination of cost center/activity type as the sender. Allocation cost element &V1& was determi...
KI154
Enter activity type only in conjunction with cost center
What causes this issue? You have specified an <DS:DE.LSTAR>activity_type</> as an account assignment object without the corresponding <...
KI155
Profitability segment being derived again
What causes this issue? You have assigned to a profitability segment together with &V1&. The auxilliary account assignment &V1& assig...
Click on this link to search all SAP messages.