Message type: E = Error
Message class: KI -
Message number: 151
Message text: Cost center/activity type &1/&2 uses allocation cost element &3, not &4.
You have entered the combination of cost center/activity type as the
sender. Allocation cost element &V1& was determined for this. Cost
element &V1& was also specified.
As the cost element must be unique, processing cannot continue.
Do not specify a cost element.
Error message extract from SAP system. Copyright SAP SE.
KI151
- Cost center/activity type &1/&2 uses allocation cost element &3, not &4. ?The SAP error message KI151 indicates that there is a mismatch between the cost element being used in a cost center/activity type allocation and the expected cost element. This typically occurs in the context of internal orders, cost centers, or activity types when trying to allocate costs.
Cause: The error message KI151 is triggered when: A cost center or activity type is configured to use a specific allocation cost element (in this case, &3), but the system is trying to use a different cost element (in this case, &4) for the allocation. This can happen due to incorrect configuration in the controlling area, cost center, or activity type settings. It may also occur if there are changes in the cost element master data or if the allocation structure has been modified.
Solution: To resolve the KI151 error, you can take the following steps: Check Configuration: Go to the configuration settings for the cost center or activity type in the
Get instant SAP help. Sign up for our Free Essentials Plan.
KI149
Reverse CO reposting document &2 first
What causes this issue? You want to reverse a document. The corresponding document has already been reposted in CO by document &V1&.System Re...
KI148
Reverse reposting document &1 for the activity allocation first
What causes this issue? You want to reverse an activity allocation or a confirmation. The corresponding document has already been reposted in CO by d...
KI152
Enter a sender activity type also
What causes this issue? You have specified sender cost center &V1& without an activity type.System Response A sender cost center is only val...
KI153
Account assignment to activity types not active in CO area &2 in &1
What causes this issue? You have entered an <DS:DE.LSTAR>activity type</> as the account assignment object,System Response Assignment to...