Do you have any question about this error?
Message type: E = Error
Message class: KG1 - CO-PA planning
Message number: 190
Message text: Enter a valuation strategy
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
KG1190
- Enter a valuation strategy ?The SAP error message KG1190, which states "Enter a valuation strategy," typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with product costing or cost object controlling. This error indicates that the system requires a valuation strategy to be defined for the relevant cost object or product.
Cause:
The error is usually caused by one of the following reasons:
- Missing Valuation Strategy: The valuation strategy has not been defined for the material or cost object in question.
- Configuration Issues: The configuration settings in the controlling area or the material master may not be set up correctly.
- Data Entry Error: The user may have overlooked entering the valuation strategy in the relevant transaction or screen.
Solution:
To resolve the KG1190 error, you can follow these steps:
Check Material Master:
- Go to the material master record (transaction code MM03).
- Ensure that the valuation strategy is defined in the costing view of the material master.
Define Valuation Strategy:
- If the valuation strategy is missing, you may need to define it. This can be done in the configuration settings:
- Navigate to SPRO (SAP Reference IMG).
- Go to Controlling > Product Cost Controlling > Cost Object Controlling > Define Valuation Strategies.
- Create or modify the valuation strategy as needed.
Check Configuration:
- Ensure that the controlling area and the relevant settings for product costing are correctly configured.
- Verify that the valuation strategy is assigned to the appropriate cost object or product type.
Data Entry:
- When entering data in the relevant transaction (e.g., creating a cost estimate), ensure that you select or enter the valuation strategy as required.
Consult Documentation:
- Review SAP documentation or help resources for specific details on how to set up and use valuation strategies in your version of SAP.
Related Information:
By following these steps, you should be able to resolve the KG1190 error and successfully enter a valuation strategy in SAP. If the issue persists, consider reaching out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
KG1189
The parameter set is still used in planning sequence &1
MESS TEXT: The parameter set is still used in planning sequence &1What causes this issue? The parameter set that you want to delete is still use...
KG1188
The variant can only be generated for the planning method "ACOP"
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KG1191
Error in one or more processing steps
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
KG1192
Exclude selection options are not supported in manual planning
What causes this issue? In the planning level or in the planning package, you have used an <ZH>"Exclude" selection option</> to...
Click on this link to search all SAP messages.