Message type: E = Error
Message class: KG1 - CO-PA planning
Message number: 016
Message text: The planning level must contain either 'period' or 'week'
A planning level must contain the characteristic 'period/year'. If the
second period type is active in costing based Profitability Analysis,
the characteristic 'week/year' can be included instead.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Choose characteristic 'period/year' or 'week/year' for the planning
level.
Error message extract from SAP system. Copyright SAP SE.
KG1016
- The planning level must contain either 'period' or 'week' ?The SAP error message KG1016, which states "The planning level must contain either 'period' or 'week'," typically occurs in the context of planning and budgeting within SAP, particularly in the Controlling (CO) module. This error indicates that the planning level you are trying to use does not meet the required criteria for either a time period or a week.
Cause:
- Incorrect Planning Level Configuration: The planning level you are using may not be set up correctly to include either a time period (like months or quarters) or a week.
- Missing Time Characteristics: The planning level might be missing the necessary time characteristics that define how data is aggregated or broken down over time.
- Data Entry Issues: When entering planning data, if the system does not recognize the time frame specified, it can trigger this error.
Solution:
Check Planning Level Configuration:
- Go to the configuration settings for the planning level in SAP.
- Ensure that the planning level includes either 'period' or 'week' as part of its definition.
- If necessary, modify the planning level to include the required time characteristics.
Review Planning Layout:
- Check the planning layout you are using to ensure it is correctly set up to include the necessary time dimensions.
- Make sure that the layout is aligned with the planning level you are trying to use.
Validate Data Entry:
- When entering planning data, ensure that you are selecting the correct time frame that corresponds to the planning level.
- If you are using a custom planning layout, verify that it is correctly configured to allow for the selection of periods or weeks.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on configuring planning levels and layouts.
Contact SAP Support:
- If the issue persists after checking the configuration and data entry, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to resolve the KG1016 error and ensure that your planning levels are correctly set up for your budgeting and planning activities in SAP.
Get instant SAP help. Start your 7-day free trial now.
KG1015
Characteristic &1 must be included in the planning level
What causes this issue? Characteristic '&V1&' is not included in the planning level. In costing-based Profitability Analysis, the c...
KG1014
Characteristic &1 is not permitted as a planning characteristic
What causes this issue? As planning characteristics, you can use all characteristics which can also be used in a planning layout. These are: All char...
KG1017
Characteristic &1 is not in the planning level
What causes this issue? Characteristic '&V1&' is included in the selection conditions, though not in the planning level.System Resp...
KG1018
Selection criterion not permitted
What causes this issue? Only individual values or intervals can be selected in the selection conditions.System Response The system issues an error m...
Click on this link to search all SAP messages.