How To Fix KEIX020 - &1, version &2: ECP is not allowed for plan-integrated objects


KEIX020 - Overview

  • Message type: E = Error

  • Message class: KEIX - ECP in Several Plan Versions

  • Message number: 020

  • Message text: &1, version &2: ECP is not allowed for plan-integrated objects

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message KEIX020 - &1, version &2: ECP is not allowed for plan-integrated objects ?
    The SAP error message KEIX020 indicates that there is an issue with the use of the ECP (External Cost Planning) functionality for plan-integrated objects. This error typically arises when you attempt to use ECP in a context where it is not permitted, particularly for objects that are integrated with planning in SAP.
    
    Cause: The error message "ECP is not allowed for plan-integrated objects" suggests that you are trying to perform an operation that involves ECP on a plan-integrated object, which is not supported. Plan-integrated objects are those that are directly linked to planning processes in SAP, and ECP is generally used for cost planning that is not integrated with these planning processes.
    Solution: To resolve this error, consider the following steps: Check Object Type: Verify the type of object you are working with. Ensure that it is not a plan-integrated object if you intend to use ECP. Review Configuration: Check the configuration settings for the planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant