Do you have any question about this error?
Message type: E = Error
Message class: KE -
Message number: 399
Message text: No valuation possible using a cost estimate from plant &
You tried to valuate data in operating concern &V4& using a product
cost estimate from plant &V1&. This plant is assigned to company code
&V2& and thus cannot be used to valuate in company code &V3&.
You cannot perform valuation using this plant.
The valuation plant must belong to the company code assigned to
operating concern &V4&.
If necessary, contact your system administrator.
Error message extract from SAP system. Copyright SAP SE.
KE399
- No valuation possible using a cost estimate from plant & ?The SAP error message KE399 ("No valuation possible using a cost estimate from plant &") typically occurs in the context of controlling and cost accounting when the system is unable to find a valid cost estimate for a specific plant. This can happen for various reasons, and understanding the cause is essential for resolving the issue.
Causes:
- Missing Cost Estimate: The cost estimate for the specified plant may not exist or may not be marked as valid for the relevant period.
- Incorrect Plant Assignment: The plant may not be correctly assigned to the material or the cost estimate.
- Costing Variant Issues: The costing variant used may not be set up correctly or may not be applicable for the material or plant in question.
- Material Master Data: The material master data may not be properly maintained, leading to issues in cost estimation.
- Valuation Class: The valuation class assigned to the material may not be compatible with the cost estimate.
- Costing Version: The costing version being used may not be valid or may not have been released.
Solutions:
- Check Cost Estimates: Verify that a valid cost estimate exists for the specified plant. You can do this by navigating to the cost estimate transaction (e.g., CK11N) and checking the relevant cost estimates.
- Review Plant Assignment: Ensure that the plant is correctly assigned to the material in the material master (transaction MM03).
- Validate Costing Variant: Check the configuration of the costing variant in the controlling area to ensure it is set up correctly for the material and plant.
- Update Material Master: If necessary, update the material master data to ensure that all relevant fields are correctly filled out, including the valuation class and costing information.
- Check Valuation Class: Ensure that the valuation class assigned to the material is compatible with the cost estimate.
- Release Costing Version: If you are using a specific costing version, ensure that it has been released and is valid for the period in question.
Related Information:
By following these steps, you should be able to identify the root cause of the KE399 error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
KE398
Valuation is not possible
What causes this issue? You tried to execute a valuation in CO-PA. To do this, at least one entry is required in the valuation table (Table TKEVA01)....
KE397
Error deriving the controlling area from the profit center
What causes this issue? The system tried to derive the controlling area from the profit center master record of profit center &V1&. The date ...
KE400
Value for characteristic & does not exist
What causes this issue? Value &V2& does not exist for characteristic &V1&.System Response The transaction is still executed.How to f...
KE401
Foreign key relationship for field & is incorrect
What causes this issue? The foreign key connection for field &V1& of Table &V2& is incorrect. The check table &V2& and check ...
Click on this link to search all SAP messages.