Do you have any question about this error?
Message type: E = Error
Message class: K5 - CO Reconciliation Ledger
Message number: 016
Message text: Periods to be reposted are being locked
You want to make transfer postings to the reconciliation ledger.
While making this posting, other CO postings in the affected periods
are not allowed, as this data might otherwise be missing in the ledger.
Therefore, the periods must be locked for all actual postings in CO.
For the duration of posting, the SAP System has locked controlling area
&V1&, periods &V2& to &V3&.
Error message extract from SAP system. Copyright SAP SE.
K5016
- Periods to be reposted are being locked ?The SAP error message K5016 ("Periods to be reposted are being locked") typically occurs in the context of controlling (CO) when you attempt to repost costs or perform a transaction that requires access to a period that is currently locked for posting. This can happen for various reasons, such as:
Causes:
- Period Locking: The financial period you are trying to post to is locked for posting. This can happen if the period is closed in Financial Accounting (FI) or if it is locked for other reasons (e.g., month-end closing activities).
- User Lock: Another user may be currently working in the same period, causing a temporary lock.
- Configuration Settings: The system may have specific settings that prevent postings in certain periods based on the company code or controlling area settings.
Solutions:
Check Period Status:
- Go to the transaction code OB52 to check the status of the posting periods. Ensure that the period you are trying to post to is open for the relevant company code and controlling area.
- If the period is closed, you may need to open it temporarily for the necessary postings, but this should be done with caution and in accordance with your organization's policies.
Coordinate with Users:
- If another user is working in the same period, coordinate with them to ensure that they complete their tasks or release the lock.
Review Configuration:
- Check the configuration settings in the controlling area to ensure that there are no restrictions on posting to the desired periods.
Use Transaction Codes:
- Use transaction codes like KSB1 (Cost Centers: Actual Line Items) or KOB1 (Orders: Actual Line Items) to check if there are any ongoing processes that might be locking the period.
Consult with Finance Team:
- If you are unsure about opening a period or if you do not have the necessary authorizations, consult with your finance or controlling team for guidance.
SAP Notes:
- Check for any relevant SAP Notes that might address this specific error or provide additional troubleshooting steps.
Related Information:
By following these steps, you should be able to identify the cause of the K5016 error and take appropriate action to resolve it.
Get instant SAP help. Start your 7-day free trial now.
K5014
No messages exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
K5013
Company code validation not active for CO area &
What causes this issue? More than one company code is assigned to controlling area &V1&. To prevent data inconsistencies, <DS:NA.K5038>...
K5018
No data found in company code &.
What causes this issue? No data was found in company code &V1& for fiscal year &V2& in periods &V2& through &V3&.Syst...
K5019
A serious error has occurred; Highest error code: &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.