Message type: E = Error
Message class: K4 - Order settlement configuration tables
Message number: 203
Message text: Percent.valid.: StratSeq/Prio. &1,Sett.type &2,SourceAssign&4,Percent.&3
During percentage validation, the system established that a total of
&V4& percent is to be settled for strategy sequence / priority &V1&,
source structure &V3&, settlement type &V2&.
Check your entries.
Note
You can deactivate this message in Customizing, or change the message
category. To do so, choose <LS>General Controlling -> Change message
control</> (work area <LS>K4</>, message number <LS>203</<) in
Customizing.
Error message extract from SAP system. Copyright SAP SE.
K4203
- Percent.valid.: StratSeq/Prio. &1,Sett.type &2,SourceAssign&4,Percent.&3 ?The SAP error message K4203 typically relates to issues in the configuration of cost planning or profitability analysis (CO-PA) in SAP. This error message indicates that there is a problem with the percentage allocation in a specific strategic sequence, priority, settlement type, or source assignment.
Cause: The error message K4203 can occur due to several reasons, including: Invalid Percentage Values: The percentage value specified for a particular strategic sequence or priority is not valid. This could mean that the percentage is either negative, exceeds 100%, or is not properly defined in the system. Missing Configuration: The configuration for the strategic sequence, priority, or settlement type may not be set up correctly in the system. This could include missing entries in the relevant customizing tables. Inconsistent Data: There may be inconsistencies in the data related to the source assignment or the way percentages are defined for different cost elements or accounts. Incorrect Master Data: The master data
Get instant SAP help. Sign up for our Free Essentials Plan.
K4202
Percentage validation: StratSeq &1/Prio. &2, sett. type &2, percentage &3
What causes this issue? During percentage validation, the system established that a total of &V4& percent is to be settled for strategy seque...
K4201
Strategies of various categories were entered for strat. seq &1/prio. &2
What causes this issue? You entered strategies with differing categories for priority &V1&. You cannot combine copy strategies or the "N...
K4204
Double entries or multiple copy strategies for strat seq &1/priority &2
What causes this issue? For strategy sequence &V1& / priority &V2&, you either entered more than one copy strategy entered the "...
K4205
StratSeq &1: Settlement profile &2 states that settlement may not be made
What causes this issue? You entered strategies for strategy sequence &V1&, and at the same time you assigned settlement profile &V2& ...
Click on this link to search all SAP messages.