Do you have any question about this error?
Message type: E = Error
Message class: JIT00 - JIT: Messages for JIT Process
Message number: 621
Message text: Scheduling agreement &1 with document type &2 has no delivery block
In Customizing, no delivery lock is assigned to document type &V2&.
This means that JIT calls can be delivered outside the JIT process.
Nevertheless, the system has transferred the scheduling agreement items
into the JIT material table.
If you do not want scheduling agreements with document type &V2& to
appear in the delivery and you want them to be delivered only from the
JIT process, set a delivery lock in Customizing for the document type.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
JIT00621
- Scheduling agreement &1 with document type &2 has no delivery block ?The SAP error message JIT00621 indicates that there is an issue with a scheduling agreement in the system. Specifically, it states that the scheduling agreement (identified by &1) with the specified document type (&2) has no delivery block. This error typically arises in the context of Just-In-Time (JIT) delivery processes, where timely delivery of materials is critical.
Cause:
- Missing Delivery Block: The scheduling agreement does not have a delivery block set, which is required for the system to process the delivery.
- Configuration Issues: There may be configuration settings in the JIT or scheduling agreement setup that are not aligned with the requirements for processing deliveries.
- Data Entry Errors: There could be errors in the data entry of the scheduling agreement, leading to the absence of a delivery block.
- Status of the Scheduling Agreement: The scheduling agreement may be in a status that does not allow for deliveries to be processed.
Solution:
- Check Scheduling Agreement: Review the scheduling agreement in question to ensure that it is correctly set up. Look for any missing fields or incorrect entries.
- Set Delivery Block: If a delivery block is required, you may need to manually set it in the scheduling agreement. This can usually be done in the scheduling agreement maintenance screen.
- Review Configuration: Check the configuration settings related to JIT and scheduling agreements in the SAP system. Ensure that all necessary settings are in place for the delivery process.
- Status Check: Verify the status of the scheduling agreement. If it is not active or is in a status that prevents deliveries, you may need to change its status.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling scheduling agreements and delivery blocks.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in JIT and scheduling agreements for further assistance.
Get instant SAP help. Start your 7-day free trial now.
JIT00620
Exactly one header row must be selected (cursor position is sufficient)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
JIT00619
Components group transferred is not assigned to a handling unit
What causes this issue? You want to unpack a components group from a handling unit. However, the components group does not contain a reference to a h...
JIT00622
Only one header row can be selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
JIT00623
Summarized JIT call profile '&1' from call &2 is not defined
What causes this issue? Summarized JIT call profile &v1& is in call &v2&. This summarized JIT call profile however does not exist. It...
Click on this link to search all SAP messages.