How To Fix JBTPA010 - Change of G/L assignment within a Profitability Analysis period


JBTPA010 - Overview

  • Message type: E = Error

  • Message class: JBTPA - Messages for Profitability Analysis in the BDT

  • Message number: 010

  • Message text: Change of G/L assignment within a Profitability Analysis period

  • Show details Hide details
  • What causes this issue?

    The general ledger assignment of a variable transaction must not change
    within a period of Bank Profitability Analysis, in which the
    transaction can be costed. For this transaction, the general ledger
    assignment changes to the validity date &V1&, which does not fall at
    the beginning of a costing period.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Change the validity date for the new general ledger assignment to the
    beginning of a period that can be calculated.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message JBTPA010 - Change of G/L assignment within a Profitability Analysis period ?
    The SAP error message JBTPA010 indicates that there is an issue with changing the General Ledger (G/L) assignment within a Profitability Analysis (CO-PA) period. This error typically arises when there is an attempt to modify the G/L account assignment for a transaction that has already been posted in a closed period.
    
    Cause: Closed Period: The most common cause of this error is that the period in which the transaction was posted is closed, and SAP does not allow changes to G/L assignments in closed periods to maintain data integrity.
    Configuration Issues: There may be configuration settings in the system that restrict changes to G/L assignments in certain scenarios. Data Consistency: The system is designed to ensure that financial data remains consistent and accurate, and changing G/L assignments can lead to discrepancies.
    Solution: Open the Period: If it is necessary to change the G/L assignment, you may need to open the closed period in the financial settings.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author