Do you have any question about this error?
Message type: E = Error
Message class: JBDVT - Messages for Variable Transaction
Message number: 151
Message text: Validity date &1 is not permitted for the ledger assignment
Company code &V2& of the variable transaction is assigned the active
bank operating concern &V3&. You can only assign a ledger at the
beginning of a period of the bank operating concern.
Specify a validity date that is equal to the start of a period.
Error message extract from SAP system. Copyright SAP SE.
JBDVT151
- Validity date &1 is not permitted for the ledger assignment ?The SAP error message JBDVT151 indicates that there is an issue with the validity date for a ledger assignment in the context of the SAP system, particularly in the area of financial accounting or controlling. This error typically arises when the date being used for a transaction or entry does not align with the allowed date range for the specified ledger.
Cause:
- Invalid Date Range: The validity date you are trying to use is outside the permitted range for the ledger assignment. This could happen if the date is too far in the past or future.
- Ledger Configuration: The ledger may not be configured to accept transactions for the specified date. This could be due to settings in the ledger configuration or fiscal year settings.
- Period Closing: The period for the ledger may have been closed, preventing any new entries from being made for that period.
- Data Entry Error: There may be a simple data entry error where the date was incorrectly inputted.
Solution:
- Check Validity Dates: Verify the validity date you are trying to use. Ensure that it falls within the allowed range for the ledger assignment.
- Review Ledger Configuration: Go to the ledger configuration settings in SAP and check the validity periods set for the ledger. Make sure that the date you are trying to use is within the configured range.
- Open Periods: If the period is closed, you may need to open it again for posting or use a different date that falls within an open period.
- Correct Data Entry: Double-check the date entered for any typographical errors and correct them if necessary.
- Consult Documentation: Refer to the SAP documentation or your organization's SAP support team for specific configurations related to your ledger.
Related Information:
OB52
to manage posting periods or OBY6
to check ledger settings.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in financial accounting within SAP.
Get instant SAP help. Start your 7-day free trial now.
JBDVT150
Last number for turnovers in company code &1 was assigned
What causes this issue? Turnover numbers for variable transactions in company code &V1& are taken from number range interval '01' o...
JBDVT149
Number for turnovers in company code &1 is in the critical range
What causes this issue? Turnover numbers for variable transactions in company code &V1& are taken from number range interval '01' o...
JBDVT152
It is not possible to maintain selection dimensions without a ledger item
What causes this issue? You attempted to create, change or delete selection dimensions for a ledger item with validity date &V1& and value fi...
JBDVT153
No selection variant exists for ledger dimension &1
What causes this issue? You attempted to change or delete a selection variant for the profitability area characteristic &V1&. The selection v...
Click on this link to search all SAP messages.