Do you have any question about this error?
Message type: E = Error
Message class: JBDVT - Messages for Variable Transaction
Message number: 135
Message text: Enter the end date for the processing period for flow data
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
JBDVT135
- Enter the end date for the processing period for flow data ?The SAP error message JBDVT135, which states "Enter the end date for the processing period for flow data," typically occurs in the context of the SAP Joint Venture Accounting (JVA) module. This error indicates that the system requires an end date for the processing period when dealing with flow data, which is essential for accurate reporting and data processing.
Cause:
- Missing End Date: The most common cause of this error is that the user has not entered an end date for the processing period in the relevant transaction or report.
- Incorrect Configuration: There may be issues with the configuration settings in the JVA module that do not allow for proper entry of dates.
- Data Entry Error: The user may have overlooked the field or entered an incorrect format for the date.
Solution:
Enter the End Date:
- Navigate to the transaction or report where the error occurred.
- Look for the field labeled "End Date" or similar.
- Enter a valid end date for the processing period. Ensure that the date format is correct as per your system's settings.
Check Configuration:
- If the error persists, check the configuration settings in the JVA module to ensure that the processing periods are set up correctly.
- Consult with your SAP administrator or a functional consultant to verify that all necessary settings are in place.
Review Documentation:
- Refer to SAP documentation or help files related to Joint Venture Accounting for additional guidance on processing periods and flow data.
User Training:
- If this error is frequently encountered, consider providing additional training for users on how to properly enter data in the JVA module.
Related Information:
By following these steps, you should be able to resolve the JBDVT135 error and ensure that the necessary end date for the processing period is correctly entered.
Get instant SAP help. Start your 7-day free trial now.
JBDVT134
Enter the start date for the processing period for flow data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
JBDVT133
Balance date &1 is before transaction start &2
What causes this issue? A daily balance, or a balance carried forward for date &V1& must be maintained. The date of a daily balance must not ...
JBDVT136
End date of the processing period is before the start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
JBDVT137
Start of the processing period is not in the permitted range
What causes this issue? Start date &V1& of the processing period for flow data does not fall in the permitted range of &V2& to &V...
Click on this link to search all SAP messages.