Do you have any question about this error?
Message type: E = Error
Message class: JA - Central error messages, project system
Message number: 018
Message text: No authorization for planner group & action &
You do not have all authorizations necessary to display or edit the
standard network &V3&.
The system checked the authorization for the planner group in the
standard network (C_PLKO_PLG) with the values:
Usage of the standard network (VERWE),,&V4&
Planner group (VAGRP),,&V1&
Action (ACTVT),,&V2&
INCLUDE 'NA_ALLG_AKTIVIT-T' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_BERECHTIGUNG' OBJECT DOKU ID TX
Error message extract from SAP system. Copyright SAP SE.
JA018
- No authorization for planner group & action & ?The SAP error message JA018 indicates that a user does not have the necessary authorization for a specific planner group and action within the SAP system. This error typically occurs in the context of planning functions, such as those found in SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO).
Cause:
- Missing Authorizations: The user attempting to perform the action does not have the required authorizations assigned to their user profile for the specified planner group.
- Incorrect Planner Group Assignment: The planner group may not be correctly assigned to the user or the user may not belong to the correct planner group.
- Role Configuration Issues: The roles assigned to the user may not include the necessary permissions for the actions they are trying to perform.
Solution:
Check User Authorizations:
- Use transaction code
SU01
to check the user’s profile and roles.- Verify if the user has the necessary authorizations for the specific planner group and action.
Assign Missing Roles:
- If the user lacks the required roles, you may need to assign the appropriate roles that include the necessary authorizations.
- This can be done using transaction code
PFCG
to modify roles and add the required authorizations.Review Planner Group Configuration:
- Ensure that the planner group is correctly configured and that the user is assigned to the correct planner group.
- Check the configuration settings in the planning application to ensure that the user is included in the relevant planner group.
Authorization Trace:
- Use transaction code
SU53
immediately after the error occurs to see which authorization checks failed. This can provide insight into what specific authorizations are missing.Consult with Security Team:
- If you are not authorized to make changes to user roles or authorizations, consult with your SAP security team or administrator to resolve the issue.
Related Information:
By following these steps, you should be able to identify and resolve the authorization issue causing the JA018 error message.
Get instant SAP help. Start your 7-day free trial now.
JA017
No authorization for activity category & action &
What causes this issue? You do not have all authorizations necessary to display or edit the network activity or activity element &V3&. The sy...
KN001
No suitable reports exist
What causes this issue? No suitable reports exist. Possible causes are: You do not have any reports in Customizing in the current application for the...
JA019
No authorization for text type & action &
What causes this issue? You do not have all authorizations necessary to display or edit the PS texts &V1& &V3&. The system checked th...
JA020
No authorization for PS texts
What causes this issue? You do not have authorization to assign or change PS texts.System Response INCLUDE 'NA_ALLG_AKTIVIT-T' OBJECT DOKU...
Click on this link to search all SAP messages.