IW472 - Error during budget check


SAP Error Message - Details

  • Message type: E = Error

  • Message class: IW - Order Processing

  • Message number: 472

  • Message text: Error during budget check

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IW472 - Error during budget check ?

    The SAP error message IW472 ("Error during budget check") typically occurs in the context of project management or internal orders when there is an issue with budget availability during a transaction, such as creating or changing a work order or project. This error indicates that the system has detected a budget violation, meaning that the planned costs exceed the available budget.

    Causes of IW472 Error

    1. Insufficient Budget: The most common cause is that the budget for the project or internal order has been exceeded or is insufficient for the planned costs.

    2. Budgeting Configuration: There may be issues with the configuration of budget controls in the system, such as incorrect settings in the budget profile or budget type.

    3. Incorrect Cost Elements: The cost elements used in the transaction may not be correctly assigned to the budget.

    4. Period Lock: The budget may be locked for the period in which the transaction is being processed.

    5. Budget Release: The budget may not have been released or may be in a status that does not allow for further expenditures.

    Solutions to IW472 Error

    1. Check Budget Availability:

      • Review the budget assigned to the project or internal order to ensure that there are sufficient funds available.
      • Use transaction codes like S_ALR_87013558 (for budget reports) to analyze the budget status.
    2. Adjust Budget:

      • If the budget is insufficient, consider increasing the budget or reallocating funds from other areas.
      • Use transaction CJ30 (for project budgets) or KO22 (for internal orders) to adjust the budget.
    3. Review Configuration:

      • Check the configuration settings for budget control in the system. Ensure that the budget profile and budget types are correctly set up.
      • Consult with your SAP configuration team if necessary.
    4. Check Cost Elements:

      • Ensure that the cost elements used in the transaction are correctly assigned to the budget and are valid for the budget type.
    5. Release Budget:

      • If the budget is not released, ensure that the necessary approvals are obtained and the budget is released for use.
    6. Period Management:

      • Verify if the period is open for posting. If the period is closed, you may need to open it or adjust the transaction to a valid period.

    Related Information

    • Transaction Codes:

      • CJ30: Change Project Budget
      • KO22: Change Internal Order
      • S_ALR_87013558: Budget Reports
    • SAP Notes: Check SAP Notes for any known issues or patches related to budget checks and the IW472 error.

    • Documentation: Review SAP documentation on budget management and internal orders for best practices and guidelines.

    • User Roles: Ensure that the user has the necessary authorizations to view and modify budgets.

    If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project systems or controlling.

    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic SAP error explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker