How To Fix IW339 - Warning occurred during budget check for maintenance plan &


IW339 - Overview

  • Message type: E = Error

  • Message class: IW - Order Processing

  • Message number: 339

  • Message text: Warning occurred during budget check for maintenance plan &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


IW339 - Details

  • The SAP error message IW339 indicates that there was a warning during the budget check for a maintenance plan. This warning typically arises when the planned costs for maintenance activities exceed the available budget or when there are issues related to budget availability in the system.
    Causes:
    
    Budget Exceeded: The planned costs for the maintenance plan exceed the allocated budget for the cost center or internal order.
    Budget Availability Control: The budget availability control settings may not be configured correctly, leading to warnings even if the budget is technically available.
    Incorrect Cost Estimates: The cost estimates for the maintenance plan may be incorrectly entered or calculated.
    Period Control Issues: The budget may not be available for the period in which the maintenance activities are scheduled.
    Master Data Issues: There may be issues with the master data related to the maintenance plan, such as incorrect cost center assignments.
    
    Solutions:
    
    Review Budget Allocation: Check the budget allocation for the relevant

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


IW339 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker