How To Fix IR184 - Reference MeasPoint does not come from the construction type allocated


IR184 - Overview

  • Message type: E = Error

  • Message class: IR - PM: IMRC - Measurement Readings and Counters

  • Message number: 184

  • Message text: Reference MeasPoint does not come from the construction type allocated

  • Show details Hide details
  • What causes this issue?

    The current <DS:GLOS.measuring_point>measuring point</> or the
    measuring point to be created belongs to a piece of equipment or
    functional location. You are trying to allocate the measuring point a
    reference measuring point that does not belong to the
    <DS:GLOS.construction_type>construction type</> currently assigned to
    the piece of equipment or functional location.

    System Response

    The assignment is not allowed.

    How to fix this error?

    Choose a reference measuring point of the construction type that is
    currently assigned, or create the required reference measuring point
    for the construction type assigned.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IR184 - Reference MeasPoint does not come from the construction type allocated ?
    The SAP error message IR184, which states "Reference MeasPoint does not come from the construction type allocated," typically occurs in the context of SAP's Industry Solution for Utilities (IS-U) when dealing with measurement points and their associated construction types.
    
    Cause: This error usually arises when there is a mismatch between the measurement point you are trying to use and the construction type that has been allocated to it. Specifically, it indicates that the reference measurement point you are trying to access or manipulate does not belong to the expected construction type. This can happen due to: Incorrect Configuration: The measurement point may not be correctly configured in relation to the construction type. Data Inconsistency: There may be inconsistencies in the master data for measurement points and construction types. Wrong Reference Point: The reference measurement point being used may not be valid for the operation you are trying to perform.
    Solution: To resolve this error, you can take

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant