Do you have any question about this error?
Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 845
Message text: The plan date entered is invalid for factory calendar &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
IP845
- The plan date entered is invalid for factory calendar &1 ?The SAP error message IP845 indicates that the plan date entered is invalid for the specified factory calendar. This typically occurs when the date you are trying to use for planning does not align with the working days or holidays defined in the factory calendar associated with the plant or work center.
Cause:
- Non-Working Days: The date you are trying to enter falls on a non-working day (e.g., weekends or holidays) as defined in the factory calendar.
- Incorrect Factory Calendar Assignment: The factory calendar assigned to the plant or work center may not be set up correctly or may not match the intended planning period.
- Date Format Issues: The date format may not be recognized by the system, leading to an invalid date error.
- Planning Horizon: The date may fall outside the planning horizon defined in the system.
Solution:
Check the Factory Calendar:
- Go to the transaction code
SCAL
(Factory Calendar) to review the factory calendar assigned to the relevant plant or work center.- Ensure that the date you are trying to enter is a valid working day.
Adjust the Date:
- If the date falls on a non-working day, select a different date that is a valid working day according to the factory calendar.
Verify Factory Calendar Assignment:
- Check the assignment of the factory calendar to the plant or work center in the configuration settings. You can do this through transaction codes like
OX10
(for plants) orCR02
(for work centers).Review Planning Horizon:
- Ensure that the date you are trying to enter is within the planning horizon set in the system. You can check this in the planning parameters or configuration settings.
Date Format:
- Ensure that the date is entered in the correct format as expected by the SAP system.
Related Information:
Transaction Codes:
SCAL
: To view and maintain factory calendars.OX10
: To check and maintain plant settings.CR02
: To check and maintain work center settings.Documentation: Refer to SAP Help documentation for more details on factory calendars and planning parameters.
User Roles: Ensure that you have the necessary authorizations to view and modify factory calendar settings.
By following these steps, you should be able to resolve the IP845 error and successfully enter a valid plan date.
Get instant SAP help. Start your 7-day free trial now.
IP844
Strategy plan not allowed for maintenance plan category &
What causes this issue? You tried to create a <DS:GLOS.3528F484E8E6556EE10000009B38F983>maintenance plan</> with <DS:GLOS.3526C329AFAB...
IP843
Error situation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IP846
No text found for strategy &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IP848
You are not authorized to change strategy &
What causes this issue? You are trying to edit a strategy which belongs to an authorization group not assigned to your user.System Response The syst...
Click on this link to search all SAP messages.