How To Fix IP812 - Define a scheduling type (time-based/performance-based)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: IP - Messages for preventive maintenance

  • Message number: 812

  • Message text: Define a scheduling type (time-based/performance-based)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IP812 - Define a scheduling type (time-based/performance-based) ?

    The SAP error message IP812, which states "Define a scheduling type (time-based/performance-based)," typically occurs in the context of maintenance planning and scheduling within the SAP system, particularly when working with maintenance plans.

    Cause:

    This error usually arises when a maintenance plan is being created or modified, and the system requires a scheduling type to be defined. The scheduling type determines how the maintenance tasks will be scheduled—either based on time intervals (time-based) or based on performance indicators (performance-based). If this parameter is not set, the system cannot proceed with the scheduling process.

    Solution:

    To resolve the IP812 error, you need to define a scheduling type for the maintenance plan. Here are the steps to do this:

    1. Access the Maintenance Plan:

      • Go to the transaction code IP01 (Create Maintenance Plan) or IP02 (Change Maintenance Plan) in SAP.
    2. Select the Maintenance Plan:

      • If you are changing an existing plan, enter the plan number and select it.
    3. Define the Scheduling Type:

      • In the maintenance plan details, look for the section where you can define the scheduling type.
      • You will typically find options for "Time-based" or "Performance-based" scheduling. Choose the appropriate type based on your maintenance strategy.
    4. Save the Changes:

      • After selecting the scheduling type, save your changes.
    5. Check for Additional Settings:

      • Ensure that all other required fields and settings for the maintenance plan are correctly filled out, as missing information can also lead to errors.

    Related Information:

    • Time-based Scheduling: This method schedules maintenance tasks based on fixed intervals (e.g., every month, every quarter).
    • Performance-based Scheduling: This method schedules maintenance tasks based on performance indicators, such as operating hours or production cycles.
    • Transaction Codes:
      • IP01: Create Maintenance Plan
      • IP02: Change Maintenance Plan
      • IP03: Display Maintenance Plan
    • Documentation: Refer to SAP Help documentation for detailed information on maintenance planning and scheduling types.

    If you continue to experience issues after following these steps, it may be helpful to check for any additional configuration settings in the SAP system or consult with your SAP administrator for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:
  • IP811 Scheduling parameters are reset
    What causes this issue? You have chosen the scheduling indicator <DS:GLOS.3526C2D3AFAB52B9E10000009B38F974>Cycle set</>.System Response ...

  • IP810 Maintain the item text
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

  • IP813 Key date scheduling not possible
    What causes this issue? You have attempted to perform key date <GL:maintenance_plan_scheduling>scheduling</>. Key date scheduling is not ...

  • IP814 Value is greater than 100%
    Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant