Do you have any question about this error?
Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 803
Message text: Maintain the cycle length
The maintenance package is marked as a package that is repeated on
a regular basis.
You must enter the cycle length for maintenance packages that are to
be repeated regularly.
Enter the cycle length. If the maintenance package is not to be
repeated regularly, enter the offset.
Error message extract from SAP system. Copyright SAP SE.
IP803
- Maintain the cycle length ?The SAP error message IP803, which states "Maintain the cycle length," typically occurs in the context of SAP's Plant Maintenance (PM) or Production Planning (PP) modules, particularly when dealing with maintenance plans or production cycles. This error indicates that the system requires a cycle length to be defined for a maintenance plan or a production order, but it has not been set.
Cause:
The error is usually caused by one of the following reasons:
- Missing Cycle Length: The cycle length for a maintenance plan or production order has not been defined. This is a required field for the system to calculate the scheduling of maintenance tasks or production runs.
- Incorrect Configuration: The configuration settings for the maintenance plan or production order may not have been set up correctly, leading to the absence of a cycle length.
- Data Entry Error: There may have been an oversight during data entry, where the cycle length was not filled in.
Solution:
To resolve the IP803 error, you can follow these steps:
Maintain Cycle Length:
- Navigate to the relevant maintenance plan or production order in SAP.
- Check the details of the plan/order and look for the field labeled "Cycle Length" or similar.
- Enter the appropriate cycle length value (e.g., days, weeks, months) based on your maintenance or production requirements.
Check Configuration:
- If you are unsure about the correct cycle length, consult with your production or maintenance planning team to determine the appropriate value.
- Ensure that the configuration settings for the maintenance plan or production order are correctly set up in the system.
Review Documentation:
- Refer to SAP documentation or user manuals for guidance on how to set up maintenance plans or production orders correctly.
- If necessary, consult with your SAP support team or a functional consultant for assistance.
Testing:
- After entering the cycle length, save the changes and try to execute the transaction again to see if the error persists.
Related Information:
By following these steps, you should be able to resolve the IP803 error and maintain the necessary cycle lengths for your maintenance plans or production orders.
Get instant SAP help. Start your 7-day free trial now.
IP802
Maintain the package number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IP801
The whole strategy will be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IP804
Maintain the cycle short text
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
IP805
Maintain the offset
What causes this issue? You have maintained the short text of the offset but have not entered the offset itself. If you enter a short text for the of...
Click on this link to search all SAP messages.