Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 420
Message text: Shift > 100% is not allowed
You have entered a shift factor of more than 100%.
The maximum possible value is 100%. The whole of the date variance
between planned date and actual date will be applied to the calculation
of the next call date in the case of a shift factor of 100%.
Correct your entry.
Error message extract from SAP system. Copyright SAP SE.
IP420
- Shift > 100% is not allowed ?The SAP error message "IP420 Shift > 100% is not allowed" typically occurs in the context of production planning and scheduling, particularly when dealing with capacity planning in the SAP system. This error indicates that the planned shift or utilization of a resource (like a machine or labor) exceeds 100%, which is not permissible.
Cause:
- Over-allocation of Resources: The system is trying to allocate more work to a resource than it can handle. For example, if a machine is scheduled to operate for more than its available capacity (e.g., more than 8 hours in a day), it will trigger this error.
- Incorrect Shift Settings: The shift definitions in the system may not be set up correctly, leading to miscalculations of available capacity.
- Planning Parameters: The planning parameters or production orders may have been incorrectly defined, leading to unrealistic expectations of resource utilization.
- Data Entry Errors: Manual entries in production planning or scheduling that exceed the defined limits can also cause this error.
Solution:
- Review Resource Capacity: Check the capacity settings for the resource in question. Ensure that the available capacity is correctly defined in the system.
- Adjust Production Orders: If a production order is causing the issue, consider adjusting the order quantity or the scheduling to fit within the available capacity.
- Modify Shift Definitions: Review and, if necessary, modify the shift definitions in the system to ensure they accurately reflect the working hours and capacity of the resources.
- Check Planning Parameters: Ensure that the planning parameters are set correctly and that they align with the actual production capabilities.
- Re-evaluate Scheduling: If the scheduling is too aggressive, consider spreading the workload over a longer period or adjusting the production schedule to avoid overloading resources.
Related Information:
CM01
(Capacity Planning) or COHV
(Mass Processing of Production Orders) to analyze and adjust capacity and production orders.By addressing the underlying causes and making the necessary adjustments, you should be able to resolve the "IP420 Shift > 100% is not allowed" error in SAP.
Get instant SAP help. Start your 7-day free trial now.
IP419
Fixing date is after the next planned date of &
What causes this issue? You have tried to fix a <DS:GLOS.maintenance_call>maintenance call</> for a date that lies after the planned date...
IP418
Fixing date is before the previous planned date
What causes this issue? You have tried to fix a <DS:GLOS.maintenance_call>maintenance call</> for a date that lies before the planned dat...
O7447
Missing partner ID for role &, start date &. Status not determined.
What causes this issue? No &V3& partner ID was entered for partner role &V1& with start date &V2&. Consequently, partner sta...
O7448
Missing account group for role & &. Status not determined.
What causes this issue? No &V3& account group ID was entered for partner role &V1& with start date &V2&. Consequently, partn...
Click on this link to search all SAP messages.