Message type: E = Error
Message class: IP - Messages for preventive maintenance
Message number: 419
Message text: Fixing date is after the next planned date of &
You have tried to fix a <DS:GLOS.maintenance_call>maintenance call</>
for a date that lies after the planned date of the subsequent call.
The original date will automatically be set again.
You can only fix a call in the period between the previous call and the
subsequent call. Enter a date that lies in this interval.
Error message extract from SAP system. Copyright SAP SE.
IP419
- Fixing date is after the next planned date of & ?The SAP error message IP419, which states "Fixing date is after the next planned date of &," typically occurs in the context of maintenance planning and scheduling within the SAP system. This error indicates that the fixing date (the date when a maintenance task is scheduled to be completed) is set to a date that is later than the next planned date for the maintenance task.
Cause:
- Incorrect Date Entry: The fixing date has been manually entered or calculated incorrectly, leading to it being set after the next planned date.
- Scheduling Conflicts: There may be a conflict in the scheduling of maintenance tasks, where the fixing date does not align with the planned maintenance schedule.
- System Configuration: There may be issues with the configuration of maintenance plans or scheduling parameters in the SAP system.
Solution:
To resolve the IP419 error, you can take the following steps:
Check Dates: Review the fixing date and the next planned date for the maintenance task. Ensure that the fixing date is set to a date that is on or before the next planned date.
Adjust Dates: If the fixing date is indeed after the next planned date, adjust the fixing date to a valid date that complies with the scheduling rules.
Review Maintenance Plan: Check the maintenance plan associated with the task to ensure that it is correctly configured and that there are no discrepancies in the scheduling.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on maintenance planning and scheduling to ensure compliance with best practices.
System Configuration: If the issue persists, it may be necessary to consult with your SAP administrator or support team to review the configuration settings related to maintenance planning.
Related Information:
By following these steps, you should be able to resolve the IP419 error and ensure that your maintenance scheduling is accurate and compliant with SAP's requirements.
Get instant SAP help. Start your 7-day free trial now.
IP418
Fixing date is before the previous planned date
What causes this issue? You have tried to fix a <DS:GLOS.maintenance_call>maintenance call</> for a date that lies before the planned dat...
IP417
Fixing date not possible before previous completion confirmation date
What causes this issue? You have tried to fix a <DS:GLOS.maintenance_call>maintenance call</> for a date that lies before the completion ...
IP420
Shift > 100% is not allowed
What causes this issue? You have entered a shift factor of more than 100%.System Response The maximum possible value is 100%. The whole of the date ...
O7447
Missing partner ID for role &, start date &. Status not determined.
What causes this issue? No &V3& partner ID was entered for partner role &V1& with start date &V2&. Consequently, partner sta...
Click on this link to search all SAP messages.