Message type: E = Error
Message class: /IBX/BL_ASSIGN -
Message number: 000
Message text: Contract ID:&1 "Date To" field must not lie in the past
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/IBX/BL_ASSIGN000
- Contract ID:&1 "Date To" field must not lie in the past ?The SAP error message
/IBX/BL_ASSIGN000 Contract ID:&1 "Date To" field must not lie in the past
typically occurs when you are trying to create or update a contract in the SAP system, and the "Date To" field (which indicates the end date of the contract) is set to a date that is earlier than the current date. This is a validation check to ensure that contracts are not set to end in the past, which would be illogical.Cause:
- Incorrect Date Entry: The user may have mistakenly entered a past date in the "Date To" field.
- System Date: The system date may be set incorrectly, leading to confusion about what constitutes a "past" date.
- Contract Logic: The business logic may require that contracts must always have a future end date to remain valid.
Solution:
- Check the Date: Review the "Date To" field in the contract and ensure that it is set to a future date. Update it to a valid future date.
- System Date Verification: Verify that the system date is correct. If the system date is incorrect, it may need to be adjusted by a system administrator.
- Business Rules Review: If the contract is intended to have a past end date for a specific reason, consult with your business process owner or SAP functional consultant to understand if there are any exceptions or specific configurations that need to be applied.
- Error Handling: If this error occurs frequently, consider implementing error handling or validation checks in the user interface to prevent users from entering invalid dates.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a technical consultant for further investigation.
Get instant SAP help. Sign up for our Free Essentials Plan.
/IBX/BL_APPRO015
Release process was started.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/IBX/BL_APPRO014
Not all planned records could be posted.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/IBX/BL_ASSIGN001
Contract ID: &1 without overlaps between two periods
What causes this issue? Check the "Date From" and "Date To" for the manual override; these dates must not overlap with other manu...
/IBX/BL_ASSIGN002
Valuation for contract: &1 is in release process
What causes this issue? The most recent valuations for the transferred contracts are already in the release process.System Response The status for t...