How To Fix /IBS/RB896 - Percentage weighting of scenarios in & does not correspond to 100%


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /IBS/RB -

  • Message number: 896

  • Message text: Percentage weighting of scenarios in & does not correspond to 100%

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /IBS/RB896 - Percentage weighting of scenarios in & does not correspond to 100% ?
    The SAP error message /IBS/RB896 Percentage weighting of scenarios in & does not correspond to 100% typically occurs in the context of SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) when the sum of the percentage weightings assigned to different scenarios does not equal 100%. This can happen in various planning scenarios where multiple options or scenarios are being evaluated.
    
    Cause: Incorrect Weighting: The most common cause is that the percentage weightings assigned to the different scenarios do not add up to 100%. For example, if you have three scenarios with weightings of 40%, 30%, and 20%, the total is only 90%. Missing Scenarios: If a scenario is missing or not properly configured, it may lead to an incorrect total. Data Entry Errors: Manual entry errors when inputting the percentage values can lead to discrepancies.
    Configuration Issues: There may be issues in the configuration of the planning area or the specific

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker