Do you have any question about this error?
Message type: E = Error
Message class: /IBS/RB -
Message number: 154
Message text: No work balance found for current requirement &1 &2 and &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/IBS/RB154
- No work balance found for current requirement &1 &2 and &3 ?The SAP error message
/IBS/RB154 No work balance found for current requirement &1 &2 and &3
typically occurs in the context of SAP Integrated Business Solutions (IBS) or SAP Advanced Planning and Optimization (APO) when the system is unable to find a work balance for a specific requirement. This can happen in various scenarios, such as during planning, scheduling, or resource allocation.Causes:
- Missing Data: The required data for the work balance may not be available in the system. This could be due to missing master data, such as resources, production versions, or work centers.
- Incorrect Configuration: The configuration settings for the planning or scheduling process may not be set up correctly, leading to the inability to find a work balance.
- Capacity Constraints: There may be capacity constraints that prevent the system from allocating work to the required resources.
- Planning Version Issues: The planning version being used may not have the necessary data or may be inactive.
- Time Period Issues: The time period for which the requirement is being checked may not have any available capacity.
Solutions:
- Check Master Data: Ensure that all relevant master data (e.g., resources, work centers, production versions) is correctly maintained and available in the system.
- Review Configuration: Verify the configuration settings related to planning and scheduling. Ensure that the settings align with the business processes.
- Analyze Capacity: Check the capacity of the resources involved. If there are capacity constraints, consider adjusting the capacity or rescheduling the requirements.
- Use Correct Planning Version: Make sure that the correct planning version is being used and that it contains the necessary data.
- Adjust Time Period: If the requirement is for a specific time period, ensure that there is available capacity during that time. You may need to extend the planning horizon or adjust the requirements.
- Run Planning Functions: If applicable, run planning functions or heuristics to generate a new plan that considers the current capacity and requirements.
Related Information:
/SAPAPO/MC90
(for planning) or /SAPAPO/DP90
(for demand planning) to analyze and adjust the planning data.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
/IBS/RB153
No work balance for &1 &2 and &3
What causes this issue? No working balance could be constructed for: Valuation method: ,,,,&v1& Flow type group:,,,,&v2& Currency:,,,...
/IBS/RB152
New planned records for RBD account can be generated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/IBS/RB155
Planned record with flow type &1 has not been processed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/IBS/RB156
No individual document for planned record exists: &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.