How To Fix IAOM_CPROJECTS012 - Enter level 99 for project controlling via the company code (/PrCtr.)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: IAOM_CPROJECTS - Cost and Revenue Controlling for cProjects

  • Message number: 012

  • Message text: Enter level 99 for project controlling via the company code (/PrCtr.)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IAOM_CPROJECTS012 - Enter level 99 for project controlling via the company code (/PrCtr.) ?
    The SAP error message IAOM_CPROJECTS012 typically occurs in the context of project controlling when there is an issue with the project structure or configuration. This specific error indicates that the system expects a level 99 entry for project controlling via the company code, which is often related to the configuration of the project hierarchy or the settings in the project system.
    
    Cause: Project Structure Configuration: The project may not be properly configured to include a level 99 (which is often used for the overall project or a summary level). Missing or Incorrect Settings: The project controlling settings in the system may not be correctly set up, leading to the requirement for a level 99 entry not being met. Company Code Settings: The company code settings for project controlling may not be aligned with the project structure.
    Solution: Check Project Structure: Ensure that the project structure includes a level 99 entry. You can do this by navigating

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant