How To Fix IAOM_CPROJECTS011 - Specify the controlling level for the selected controlling method


SAP Error Message - Details

  • Message type: E = Error

  • Message class: IAOM_CPROJECTS - Cost and Revenue Controlling for cProjects

  • Message number: 011

  • Message text: Specify the controlling level for the selected controlling method

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message IAOM_CPROJECTS011 - Specify the controlling level for the selected controlling method ?

    The SAP error message IAOM_CPROJECTS011 indicates that there is a missing specification for the controlling level when using a particular controlling method in the context of project management. This error typically arises in the SAP system when you are trying to create or manage a project and the system requires additional information regarding how costs and revenues should be controlled.

    Cause:

    The error is usually caused by one of the following reasons:

    1. Missing Controlling Level: The controlling level for the selected controlling method has not been defined in the project settings.
    2. Configuration Issues: The controlling method you are trying to use may not be properly configured in the system.
    3. Project Definition: The project definition may not include all necessary parameters, including the controlling level.

    Solution:

    To resolve this error, you can follow these steps:

    1. Check Project Settings:

      • Go to the project definition in SAP and ensure that all required fields are filled out, especially the controlling level.
      • Navigate to the project management transaction (e.g., CJ20N) and check the project details.
    2. Define Controlling Level:

      • If the controlling level is not specified, you need to define it. This can usually be done in the project definition or in the controlling area settings.
      • You may need to consult with your SAP configuration team to ensure that the controlling levels are set up correctly in the system.
    3. Review Controlling Method Configuration:

      • Check the configuration of the controlling method you are using. Ensure that it is correctly set up in the system and that it aligns with the project type you are working with.
      • You can access the configuration settings through the SPRO transaction and navigate to the relevant sections for project system and controlling.
    4. Consult Documentation:

      • Review SAP documentation or help files related to project management and controlling methods for additional guidance on how to set up the controlling level.
    5. User Authorization:

      • Ensure that you have the necessary authorizations to make changes to project settings and controlling configurations.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJ01 (Create Work Breakdown Structure), and SPRO (SAP Project Reference Object).
    • SAP Notes: Check for any SAP Notes related to this error message for specific patches or updates that may address the issue.
    • Training and Support: If you are unsure about making changes, consider reaching out to your SAP support team or attending training sessions on project management in SAP.

    By following these steps, you should be able to resolve the error message IAOM_CPROJECTS011 and successfully specify the controlling level for your project.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author