Message type: E = Error
Message class: HRHCP00_PLAN - Messages About Personnel Cost Plan
Message number: 095
Message text: Error in BAdI implementation; cost item period is invalid
The derived and additional cost items were changed in an implementation
of the BAdI HRHCP00_DERIVE_VALU with the method
CHANGE_DERIVED_COSTITEMS. The return table contains cost items whose
period exceeds the validity of the object. The cost object is valid
from &V3& to &V4&, but a cost item exists that is valid from &V1& to
&V2&.
The system does not process these cost items any further.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check the BAdI implementation.
Error message extract from SAP system. Copyright SAP SE.
HRHCP00_PLAN095
- Error in BAdI implementation; cost item period is invalid ?The SAP error message HRHCP00_PLAN095, which indicates "Error in BAdI implementation; cost item period is invalid," typically arises in the context of Human Capital Management (HCM) when there is an issue with the implementation of a Business Add-In (BAdI) related to planning or cost items.
Cause: Invalid Period: The error usually occurs when the cost item period specified in the planning data is not valid. This could be due to: The period being outside the defined fiscal year or planning horizon. The period not being open for posting or planning in the system. Incorrect configuration in the BAdI implementation that does not handle the period correctly. BAdI Implementation Issues: If the BAdI implementation has not been correctly coded or configured, it may not handle certain scenarios properly, leading to this error. Data Consistency: There may be inconsistencies in the data being processed, such as missing or incorrect entries in the planning tables.
Solution: Check Period Validity: Verify that the period
Get instant SAP help. Sign up for our Free Essentials Plan.
HRHCP00_PLAN094
Error in BAdI implementation; periods overlap
What causes this issue? You have used the method &V1& of BAdI HRHCP00_DERIVE_VALU to determine the organizational grouping of cost objects. T...
HRHCP00_PLAN093
Error in BAdI implementation; periods have gaps
What causes this issue? In the enhancement (BAdI) HRHCP00_POST_PERIODS the posting periods have been changed. Since this change the posting periods h...
HRHCP00_PLAN096
Error in BAdI impl.; incorrect assignment to alternative account assgmt
What causes this issue? The derived and additional cost items were changed in an implementation of the BAdI HRHCP00_DERIVE_VALU with the method CHANG...
HRHCP00_PLAN097
Error in BAdI implementation; invalid period
What causes this issue? The object selection for the planning run was changed in an implementation of the BAdI HRHCP00_RUN_OBJSEL. The return table c...
Click on this link to search all SAP messages.