How To Fix HCM_CATS_TS_MSG018 - Please select the correct Billing Control Category as per project plan


HCM_CATS_TS_MSG018 - Overview

  • Message type: E = Error

  • Message class: HCM_CATS_TS_MSG - Message Class for Tetris Based Time Sheet

  • Message number: 018

  • Message text: Please select the correct Billing Control Category as per project plan

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message HCM_CATS_TS_MSG018 - Please select the correct Billing Control Category as per project plan ?
    The SAP error message HCM_CATS_TS_MSG018 typically occurs in the context of the Cross-Application Time Sheet (CATS) when there is an issue with the billing control category associated with a project. This error indicates that the billing control category selected does not match the requirements defined in the project plan.
    
    Cause: Incorrect Billing Control Category: The billing control category selected in the time sheet does not align with the categories defined in the project plan. Project Configuration: The project may not be configured correctly, or the billing control categories may not be set up properly in the project definition. Missing Authorizations: The user may not have the necessary authorizations to select the appropriate billing control category. Project Status: The project might be in a status that does not allow for certain billing control categories to be used.
    Solution: Check Project Plan: Review the project plan to ensure that the billing control categories are correctly defined and that the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker