Message type: E = Error
Message class: H1 - Messages Used in HR Funds and Position Management
Message number: 406
Message text: Error during reconciliation with Funds Management
An error occurred when writing distributed values in Funds Management.
Unable to update values.
Reconstruct the distributed values, or run a consistency check with
Funds Management.
Error message extract from SAP system. Copyright SAP SE.
H1406
- Error during reconciliation with Funds Management ?The SAP error message H1406, which indicates "Error during reconciliation with Funds Management," typically arises in the context of financial transactions and budget management within the SAP system. This error can occur during the reconciliation process between the General Ledger (GL) and the Funds Management (FM) module, often due to discrepancies in budget availability or incorrect configuration. Causes of H1406 Error Budget Availability Issues: The most common cause is that the budget is not available for the transaction being processed. This can happen if the budget has already been fully utilized or if there are restrictions on the budget. Incorrect Configuration: There may be configuration issues in the Funds Management settings, such as incorrect assignment of budget types or fund centers. Posting Period Issues: The posting period may be closed, preventing any further transactions from being processed. Data Inconsistencies: There may be inconsistencies in the data between the FM and GL modules, such as mismatched
Get instant SAP help. Sign up for our Free Essentials Plan.
H1405
Budget update not possible for an integrated budget structure element
What causes this issue? The budget structure element in question was generated in Funds Management. Consequently, the budget of this budget structure...
H1404
Error when determining budgets in Funds Management
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
H1407
The budget structure element cannot be copied
What causes this issue? You cannot copy the budget structure element because the budget of the budget structure element to which it is to be assigned...
H1408
The budget structure element can be copied a maximum of &1 times
What causes this issue? The size of the budget of the higher-level budget structure element means that the budget structure element can be copied a m...
Click on this link to search all SAP messages.