Do you have any question about this error?
Message type: E = Error
Message class: H1 - Messages Used in HR Funds and Position Management
Message number: 334
Message text: Unable to determine cost center for & & in the period & to &
You tried to finance &v1& &v2&.
However, &v1& &v2& has not been assigned a cost center in the period
from &v3& to &v4&.
The system requires this information so that it can determine the
budget structure element to be used for financing.
Unable to determine budget structure element to be used for financing.
Use the <LS>search function</> to select a suitable budget structure
element.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
H1334
- Unable to determine cost center for & & in the period & to & ?The SAP error message H1334, "Unable to determine cost center for & & in the period & to &," typically occurs in the context of cost accounting or when trying to post transactions that require a cost center assignment. This error indicates that the system is unable to find a valid cost center for the specified parameters (such as the company code, controlling area, or other relevant fields) within the specified period.
Causes:
- Missing Cost Center Master Data: The cost center may not exist in the system for the specified controlling area or company code.
- Inactive Cost Center: The cost center might be inactive for the specified period.
- Incorrect Period: The posting period may be closed or not open for the specified cost center.
- Configuration Issues: There may be issues with the configuration of the controlling area or cost center assignment.
- Authorization Issues: The user may not have the necessary authorizations to access the cost center data.
Solutions:
Check Cost Center Master Data:
- Go to the cost center master data (transaction code KS03) and verify that the cost center exists for the specified controlling area and company code.
- Ensure that the cost center is active for the period in question.
Verify Posting Period:
- Check the posting period settings in the controlling area (transaction code OB52) to ensure that the period is open for posting.
- If the period is closed, you may need to open it or post in an open period.
Review Configuration:
- Ensure that the cost center is correctly assigned to the relevant controlling area and that all necessary configurations are in place.
- Check if there are any specific settings related to cost center assignment in the configuration (transaction code OKKP).
Check Authorizations:
- Ensure that the user has the necessary authorizations to access and post to the cost center. This can be checked with the security team or by reviewing the user roles.
Consult Documentation:
- Review SAP documentation or notes related to this error message for any additional insights or specific fixes that may apply to your version of SAP.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement the necessary solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
H1333
No funds required for & & in the period specified
What causes this issue? You tried to finance &v1& &v2&. However, &v1& &v2& does not require any funds in the period i...
H1332
Unable to determine expenditure type for personnel number &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
H1335
No FM account assignments defined for the cost center (& &)
What causes this issue? You tried to finance &v1& &v2&. However, neither a <DS:GLOS.3526B98AAFAB52B9E10000009B38F974>fund</&...
H1336
No commitment item defined for expenditure type & and grouping &
What causes this issue? A <DS:GLOS.3528E9E8E8AA5570E10000009B38F983>commitment item</> has not been defined in FM area &v3& for e...
Click on this link to search all SAP messages.