How To Fix GRPG113 - Grouping WBS element does not depend on the material


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GRPG - Grouping/Pegging for Individual Project Planning

  • Message number: 113

  • Message text: Grouping WBS element does not depend on the material

  • Show details Hide details
  • What causes this issue?

    Grouping element &v1& is type <ls>1</>, which means it is valid for all
    materials.

    System Response

    INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID TX

    How to fix this error?

    Change the value of grouping WBS element indicator to <ls>2</>. This
    means that grouping WBS element depends on the MRP group/plant and it
    can be asigned to the material.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GRPG113 - Grouping WBS element does not depend on the material ?

    The SAP error message GRPG113 ("Grouping WBS element does not depend on the material") typically occurs in the context of project management and material management within SAP. This error indicates that there is an issue with the configuration or assignment of a Work Breakdown Structure (WBS) element in relation to a material.

    Cause:

    1. Incorrect Configuration: The WBS element may not be properly configured to link with the material. This can happen if the WBS element is not set up to allow for material assignment.
    2. Material Assignment Issues: The material you are trying to assign to the WBS element may not be relevant or applicable to that specific WBS element.
    3. Project Structure: The project structure may not support the grouping of the WBS element with the material, leading to this error.
    4. Missing Dependencies: There may be missing dependencies or settings that need to be established for the WBS element to recognize the material.

    Solution:

    1. Check WBS Element Configuration: Review the configuration of the WBS element in the project structure. Ensure that it is set up to allow for material assignments.
    2. Verify Material Relevance: Ensure that the material you are trying to assign is relevant to the WBS element. Check if the material is correctly defined and available in the system.
    3. Review Project Settings: Look into the project settings and ensure that the WBS element is correctly linked to the project and that all necessary dependencies are established.
    4. Consult Documentation: Refer to SAP documentation or help resources for specific configuration settings related to WBS elements and material assignments.
    5. Use Transaction Codes: Utilize transaction codes like CJ20N (Project Builder) to review and modify the project structure and WBS elements.
    6. Check Authorizations: Ensure that you have the necessary authorizations to make changes to the WBS elements and material assignments.

    Related Information:

    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • SAP Community: Engage with the SAP Community forums for insights from other users who may have encountered and resolved similar issues.
    • Training and Documentation: Consider training sessions or documentation on project management and material management in SAP to better understand the relationships between WBS elements and materials.

    If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant