Do you have any question about this error?
Message type: E = Error
Message class: GRPG - Grouping/Pegging for Individual Project Planning
Message number: 111
Message text: WBS element & is not a grouping WBS element
WBS element has not been marked as a <DS:GLOS.grouping WBS
element>grouping WBS element</>, on which requirements can be grouped.
INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID TX
If you want to specify that the WBS element is a grouping WBS element,
do so in <DS:TRAN.CJ12>Maintaining master data for WBS elements</> by
entering the value 1 or 2 for the <l>Grouping WBS element</> indicator.
Error message extract from SAP system. Copyright SAP SE.
GRPG111
- WBS element & is not a grouping WBS element ?The SAP error message GRPG111 indicates that the Work Breakdown Structure (WBS) element you are trying to use is not recognized as a grouping WBS element. This typically occurs in the context of project management within SAP, particularly when dealing with project structures and hierarchies.
Cause:
- Incorrect WBS Element Type: The WBS element you are trying to use may not be defined as a grouping WBS element in the system. Grouping WBS elements are specifically designated to group other WBS elements or activities.
- Configuration Issues: There may be configuration settings in the project system that do not allow the selected WBS element to function as a grouping element.
- WBS Element Status: The WBS element might be in a status that does not allow it to be used for grouping, such as being locked or not fully activated.
- Hierarchy Structure: The WBS element may not be positioned correctly within the project hierarchy, leading to it not being recognized as a grouping element.
Solution:
- Check WBS Element Type: Verify that the WBS element you are trying to use is indeed defined as a grouping WBS element. You can do this by checking the WBS element's attributes in the project system.
- Review Configuration: If you have access to configuration settings, ensure that the WBS element is set up correctly in the project system configuration. This may involve checking the project profile settings.
- Change Status: If the WBS element is locked or in a non-active status, you may need to change its status to allow it to be used as a grouping element.
- Hierarchy Adjustment: Ensure that the WBS element is correctly positioned within the project hierarchy. You may need to adjust the structure to ensure it can function as a grouping element.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on WBS elements and their configurations.
Related Information:
CJ20N
(Project Builder) or CJ03
(Display WBS Element) to view and manage WBS elements.By following these steps, you should be able to identify the cause of the GRPG111 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
GRPG110
An unique assignment to a grouping WBS element is not possible
What causes this issue? WBS element &v1& could not be assigned uniquely to a grouping WBS element. &v1& has been assigned to several ...
GRPG103
MRP group &1 has not been activated for requirements grouping
What causes this issue? You have tried to use MRP group &v1& for a validity area. This is not allowed, as long as the MRP group has not been ...
GRPG112
Enter WBS element for project definition &
What causes this issue? The component WBS element you entered belongs to a different project definition than the WBS element of the material componen...
GRPG113
Grouping WBS element does not depend on the material
What causes this issue? Grouping element &v1& is type <ls>1</>, which means it is valid for all materials.System Response INCLUD...
Click on this link to search all SAP messages.