Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: GRPG - Grouping/Pegging for Individual Project Planning
Message number: 028
Message text: Reservation is account assigned to another WBS element (&1) than entry &2
The WBS element, to which the reservation is account assigned, is not
the WBS element you hav entered.
&what_to_do&
Check your entry. If you do not enter a WBS element, the system uses
the WBS element, to which the reservation is account assigned.
Error message extract from SAP system. Copyright SAP SE.
GRPG028
- Reservation is account assigned to another WBS element (&1) than entry &2 ?The SAP error message GRPG028 indicates that there is a mismatch between the reservation and the Work Breakdown Structure (WBS) element it is assigned to. Specifically, the reservation is linked to a different WBS element than the one you are trying to use or reference in your transaction.
Cause:
- Incorrect WBS Element: The reservation you are trying to process is associated with a specific WBS element, but you are attempting to assign it to a different WBS element.
- Data Entry Error: There may have been a mistake in entering the WBS element during the transaction.
- Changes in Project Structure: If the project structure has been modified (e.g., WBS elements have been changed or deleted), it may lead to this error.
- Multiple Assignments: The reservation might have been created for a different project or WBS element, leading to conflicts when trying to reassign it.
Solution:
- Verify WBS Element: Check the WBS element associated with the reservation. You can do this by navigating to the reservation in the system and reviewing its details.
- Correct the Entry: If you find that the WBS element is incorrect, you can either:
- Change the WBS element in your transaction to match the one associated with the reservation.
- If necessary, create a new reservation for the correct WBS element.
- Review Project Structure: Ensure that the project structure is up to date and that the WBS elements are correctly defined and assigned.
- Consult Documentation: If you are unsure about the correct WBS element or how to proceed, consult your project documentation or speak with your project manager or SAP administrator.
Related Information:
MB21
(Create Reservation) or MB22
(Change Reservation) to manage reservations.By following these steps, you should be able to resolve the GRPG028 error and ensure that your reservations are correctly assigned to the appropriate WBS elements.
Get instant SAP help. Sign up for our Free Essentials Plan.
GRPG027
Item &2 reservation &1 does not belong to the valuated project stock
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GRPG026
Could not find item &2, reservation &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GRPG029
The allocated quantity is larger than the total order quantity
What causes this issue? The sum of the quantities allocated to the individual requirements is larger than the overall quantity of the production orde...
GRPG030
More than one allocation to a requirement is not permitted
What causes this issue? You have allocated a requirement to a replenishment element several times.How to fix this error? Check your entriesError mes...
Click on this link to search all SAP messages.