Message type: E = Error
Message class: GRANTMGMT - Grants Management Message Class
Message number: 485
Message text: No valid availability control ledger specified
The process cannot be started, because no valid
<DS:DE.BUAVC_ALDNR>availability control ledger</> has been specified.
The process aborts.
Specify at least one availability control ledger that is valid for
Grants Management.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GRANTMGMT485
- No valid availability control ledger specified ?The SAP error message GRANTMGMT485 indicates that there is no valid availability control ledger specified for the grant management process. This error typically arises when you are trying to perform operations related to grant management, such as budgeting or posting transactions, but the system cannot find a valid availability control ledger associated with the grant. Causes: Missing Configuration: The availability control ledger may not be configured correctly in the system. Incorrect Grant Settings: The grant or project may not be linked to a valid availability control ledger. Authorization Issues: The user may not have the necessary authorizations to access the availability control ledger. Data Inconsistencies: There may be inconsistencies in the master data related to the grant or project. Solutions: Check Configuration: Go to the configuration settings for availability control in SAP. Ensure that the availability control ledger is defined and properly configured. Use transaction code SPRO to navigate to the relevant configuration settings. Assign Availability Control Ledger: Ensure that the
Get instant SAP help. Sign up for our Free Essentials Plan.
GRANTMGMT484
Activation of ledger &1 not possible: ledger attributes are missing
What causes this issue? The <DS:DE.BUAVC_ALDNR>availability control ledger</> &V1& cannot be activated for company code &V2&a...
GRANTMGMT483
Budget consumption &2 less than overall budget for several document items
What causes this issue? The current budget consumption is &V2& less than the overall budget for several document items from item &V1&...
GRANTMGMT486
No error found: Customizing for &1 in &2 &3 complete
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GRANTMGMT487
Availability control ledger &1 was copied accordingly to ledger &2
What causes this issue? <DS:DE.BUAVC_ALDNR>Availability control ledger</> &V1& was used as a reference ledger for copying AVC led...
Click on this link to search all SAP messages.