Message type: E = Error
Message class: GRANTMGMT - Grants Management Message Class
Message number: 480
Message text: Budget consumption &2 less than overall budget for document item &1
The current budget consumption is &V2& less than the overall budget for
the document item &V1&. Budget control raised this message for the
following combination of availability control ledger and control object:
&V3&&V4&
Note: The control object is defined for a grant/fund/sponsored
program/sponsored class/budget time slice.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GRANTMGMT480
- Budget consumption &2 less than overall budget for document item &1 ?The SAP error message GRANTMGMT480 indicates that the budget consumption for a specific document item is less than the overall budget allocated for that item. This error typically arises in the context of budget management within SAP, particularly when dealing with grants or project budgets.
Cause: Budget Allocation Issues: The overall budget for the document item may not have been properly allocated or may have been reduced. Incorrect Document Item: The document item referenced may not have the correct budget assigned to it. Budget Consumption Calculation: The system may be calculating budget consumption incorrectly due to configuration issues or data entry errors. Posting Errors: There may be postings that have not been accounted for, leading to discrepancies in budget consumption.
Solution: Check Budget Allocation: Verify that the overall budget for the document item is correctly allocated. You can do this by navigating to the budget management transaction and reviewing the budget settings. Review Document Item: Ensure that the
Get instant SAP help. Sign up for our Free Essentials Plan.
GRANTMGMT479
Overall budget exceeded by &2 for document item &1
What causes this issue? The overall budget is exceeded by &V2& for the document item &V1&. Budget control raised this message for the...
GRANTMGMT478
Overall budget of &2 exhausted for document item &1
What causes this issue? The overall budget of the availability control ledger &V2& is exhausted for the document item &V1&. Budget co...
GRANTMGMT481
Overall budget of &2 exhausted for several document items from item &1 on
What causes this issue? The overall budget of the availability control ledger &V2& is exhausted for several document items from item &V1&...
GRANTMGMT482
Overall budget exceeded by &2 for several document items from item &1 on
What causes this issue? The overall budget is exceeded by &V2& for several document items from item &V1& on. Budget control raised th...
Click on this link to search all SAP messages.