Message type: E = Error
Message class: GRANTMGMT - Grants Management Message Class
Message number: 477
Message text: Budget consumption &2 less than overall budget for &1
The current budget consumption is &V2& less than the overall budget for
the GM account assignment &V1&. Budget control raised this message for
the following combination of availability control ledger and control
object:
&V3&&V4&
Note: The control object is defined for a grant/fund/sponsored
program/sponsored class/budget time slice.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GRANTMGMT477
- Budget consumption &2 less than overall budget for &1 ?The SAP error message GRANTMGMT477 indicates that the budget consumption for a specific grant or project is less than the overall budget allocated for that grant or project. This message typically arises in the context of budget management within SAP, particularly in modules related to grants management or project systems.
Cause: Budget Allocation Issues: The overall budget for the grant or project may not have been properly allocated or may have been reduced. Incorrect Budget Consumption Reporting: The system may be reporting budget consumption incorrectly due to data entry errors or configuration issues. Budget Control Settings: The budget control settings may not be configured correctly, leading to discrepancies in how budget consumption is tracked. Posting Errors: There may be errors in the postings related to the grant or project that affect the budget consumption figures.
Solution: Review Budget Allocation: Check the budget allocation for the grant or project to ensure that it is set up correctly and
Get instant SAP help. Sign up for our Free Essentials Plan.
GRANTMGMT476
Overall budget exceeded by &2 for &1
What causes this issue? The overall budget is exceeded by &V2& for the GM account assignment &V1&. Budget control raised this message...
GRANTMGMT475
Overall budget of &2 exhausted for &1
What causes this issue? The overall budget of the availability control ledger &V2& is exhausted for the GM account assignment &V1&. B...
GRANTMGMT478
Overall budget of &2 exhausted for document item &1
What causes this issue? The overall budget of the availability control ledger &V2& is exhausted for the document item &V1&. Budget co...
GRANTMGMT479
Overall budget exceeded by &2 for document item &1
What causes this issue? The overall budget is exceeded by &V2& for the document item &V1&. Budget control raised this message for the...
Click on this link to search all SAP messages.