Do you have any question about this error?
Message type: E = Error
Message class: GPDPEG - A&D GPD message classed used by Pegging only
Message number: 256
Message text: Save: Missing Assigned WBS for Plant &1 Group &2 Replen &3 Material &4
Assigned WBS element is missing on an assignment about to be saved.
Plant: &V1&
Grouping WBS element: &V2&
Replenishment object: &V3&
Material: &V4&
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Possible cause is an incorrect BAdI implementation.
Error message extract from SAP system. Copyright SAP SE.
GPDPEG256
- Save: Missing Assigned WBS for Plant &1 Group &2 Replen &3 Material &4 ?The SAP error message GPDPEG256 indicates that there is a missing assignment of a Work Breakdown Structure (WBS) element for a specific plant, group, replenishment type, and material. This error typically occurs in the context of planning and inventory management, particularly when dealing with materials that are part of a project or production order.
Cause:
Missing WBS Assignment: The primary cause of this error is that the system cannot find a valid WBS element assigned to the specified plant and material combination. This can happen if:
- The WBS element has not been created or is inactive.
- The WBS element is not assigned to the relevant plant or material.
- There is a mismatch in the configuration or master data.
Configuration Issues: There may be issues in the configuration settings related to project management or material management that prevent the system from recognizing the WBS assignment.
Data Entry Errors: Incorrect data entry during the creation of the material master or WBS element can lead to this error.
Solution:
Check WBS Assignment:
- Go to the WBS element in the SAP system and verify if it is correctly assigned to the relevant plant and material.
- Ensure that the WBS element is active and not in a closed or inactive state.
Create or Update WBS Element:
- If the WBS element does not exist, create a new WBS element and ensure it is assigned to the correct plant and material.
- If it exists but is not assigned correctly, update the assignment.
Review Configuration:
- Check the configuration settings in the SAP system related to project management and material management to ensure they are set up correctly.
- Consult with your SAP configuration team if necessary.
Data Validation:
- Validate the data entered for the material master and WBS element to ensure there are no discrepancies or errors.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on handling WBS assignments and related configurations.
Related Information:
CJ20N
(Project Builder) to manage WBS elements or MM02
(Change Material) to check material master data.By following these steps, you should be able to resolve the GPDPEG256 error and ensure that the necessary WBS assignments are in place for your materials.
Get instant SAP help. Start your 7-day free trial now.
GPDPEG255
Save: Missing replen for plant &1 group &2 material &4
What causes this issue? Replenishment object is missing on an assignment about to be saved. Plant: &V1& Grouping WBS element: &V2& Ma...
GPDPEG254
Save: Invalid replen for plant &1 group &2 replen &3 material &4
What causes this issue? Replenishment object is not valid on an assignment about to be saved. (The two-character prefix for the replenishment object ...
GPDPEG257
Save: Missing order QTY for Plant &1 Group &2 Replen &3 Material &4
What causes this issue? Order quantity is missing on an assignment about to be saved. Plant: &V1& Grouping WBS element: &V2& Replenis...
GPDPEG258
Save: Invalid Group &2 replace with Acct. Group &4 for Replenishment &3
What causes this issue? Grouping WBS element field of the pegging results table contains the receiving grouping WBS element instead of the sending gr...
Click on this link to search all SAP messages.