Do you have any question about this error?
Message type: E = Error
Message class: GP - FI-SL and CO planning
Message number: 410
Message text: From period > to period (please change)
The from period &V1& entered is greater than the to period &V2&
entered.
However, you can only ever plan within one fiscal year, so that the
from period must always be less than the two period.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Change either the from period or the to period or both periods.
Error message extract from SAP system. Copyright SAP SE.
GP410
- From period > to period (please change) ?The SAP error message GP410 ("From period > to period (please change)") typically occurs in the context of time management or payroll processing within the SAP system. This error indicates that the specified "from period" is greater than the "to period," which is logically incorrect.
Cause:
- Incorrect Date Range: The user has entered a date range where the start date (from period) is later than the end date (to period).
- Data Entry Error: This can happen due to a simple typographical error when entering the periods.
- Configuration Issues: In some cases, it may be related to configuration settings in the system that define valid periods for processing.
Solution:
- Check Input Values: Review the values entered for the "from period" and "to period." Ensure that the "from period" is earlier than or equal to the "to period."
- Correct the Dates: If you find that the dates are incorrect, modify them to reflect the correct range.
- Validation: After making changes, validate the input to ensure that the error does not reoccur.
- Consult Documentation: If you are unsure about the correct periods to enter, refer to your organization's documentation or consult with a supervisor or SAP expert.
- System Configuration: If the issue persists and you suspect it may be related to system configuration, consult with your SAP Basis or configuration team to ensure that the periods are set up correctly in the system.
Related Information:
By following these steps, you should be able to resolve the GP410 error and continue with your SAP processes.
Get instant SAP help. Start your 7-day free trial now.
GP409
Check off at least one of the fields
What causes this issue? Either you have not defined a field group for manual planning, or you have not selected a field group for display on the init...
GP408
Class & has already been created
What causes this issue? You want to create planning parameter class &V1&. However, another user is currently creating this class.System Resp...
GP411
Period interval > total period (please change)
What causes this issue? You have entered period frequency &V1&. The total planning period is &V4& periods = from period &V2&...
GP412
Period interval does not correspond to planning period
What causes this issue? You have entered the period frequency &V1&. However, this interval does not match the complete planning period, sinc...
Click on this link to search all SAP messages.